MK 0
12
III 7 - MEASURING AND FITTING THE UPPER (CUT) LUFF PROFILE
III 7 a
- Accurately measure the length« A
to
D », D being the upper edge of the articulation
bracket. Please see drawing 8.
III 7 b
- Mark the « A
to
D » length on the remaining luff profile (2) and cut it at this exact
length. File smooth the cut edge .
Note : in case you have a fractional rig or a very flexible mast, please cut upper profile at
A/D minus 5 mm (13/64”), but keep the sheave box at the same position, thus giving 5
mm play between “A” and the upper edge of the cut profile.
III 7 c
- Fit without tightening the 2 set screws (9) on the threads located at the opposite
side of the cut end.
III 7 d
- Assemble the cut luff profile onto the next to last 2 m profile (2).
III 8 - FITTING THE UPPER (CUT) LUFF PROFILE ONTO THE SHEAVE BOX
III 8 a
- Completely insert the striped aluminium bar of the sheave box (11) into the upper
cut end of the luff profile (2).
III 8 b
- Insert the bottom end of the luff profile (2) into the next lower connector/articulation
(4).
III 8 c
- Fit again the sheave box (11) onto/between both end brackets (6) and fit and fasten
the 4 slides screws (7) to permanently secure this assembly.
III 8 d
- Tighten the set screws (9) at the bottom end of the cut luff profile (2).
III 8 e
- Follow the path for the mainsail halyard as shown on drawing 8.
Drawing 8
Summary of Contents for MK0
Page 1: ......
Page 5: ...MK 0 5...
Page 24: ...MK 0 24...
Page 28: ...MK 0 28 Drawing 18 4 BATTEN MAINSAIL LUFF CURVE DESIGN...
Page 29: ...MK 0 29 Drawing 19 BATTENS ANGLE TO THE LUFF CONSIDERED AS A STRAIGHT LINE...
Page 30: ...MK 0 30 Drawing 20 BATTEN POCKET CONSTRUCTION...
Page 31: ...MK 0 31 Drawing 21 CLEW...
Page 32: ...MK 0 32 Drawing 22 TACK...