MK 0
10
III 5 - FITTING THE ARTICULATIONS BRACKETS ONTO THE MAST
III 5 a
- Consider the 2 lower slide screws (7) stacked above track entrance.
III 5 b
- Fit an articulation bracket (5) on the mast with these slide screws (7). Please see
drawing 5.
III 5 c
- Fit the washers (33) and locknuts (8) onto the thread of the slide screws (7).
Tightening torque should be 1 daN/m.
Caution : during fitting the articulation brackets (5) onto the connector/articulations (4),
double check that the feeder profile is permanently and fully inserted in the gooseneck
articulation (10).
III 5 d
- Continue fitting all the articulation brackets (4 & 5) with the same procedure.
III 6 - FITTING THE SHEAVE BOX
III 6 a
- Slide up in the mast track the 4 uppermost remaining slide screws (7).
III 6 b
- Temporarily fit the 2 end brackets (5a) and the sheave box (11) so that the rear
upper end of the sheave box leaves a minimum clearance of 20 mm with the backstay(s).
Please see drawing 6.
Drawing 5
Drawing 6
Summary of Contents for MK0
Page 1: ......
Page 5: ...MK 0 5...
Page 24: ...MK 0 24...
Page 28: ...MK 0 28 Drawing 18 4 BATTEN MAINSAIL LUFF CURVE DESIGN...
Page 29: ...MK 0 29 Drawing 19 BATTENS ANGLE TO THE LUFF CONSIDERED AS A STRAIGHT LINE...
Page 30: ...MK 0 30 Drawing 20 BATTEN POCKET CONSTRUCTION...
Page 31: ...MK 0 31 Drawing 21 CLEW...
Page 32: ...MK 0 32 Drawing 22 TACK...