44/1
8
NOTICE D’INSTRUCTIONS GENERALE POUR
COFFRETS ET ARMOIRES ELECTRIQUES
V3.0
Page 44 / 51
E.
C
C
O
O
N
N
D
D
E
E
N
N
S
S
E
E
R
R
S
S
C
C
O
O
N
N
T
T
R
R
O
O
L
L
S
S
P
P
R
R
I
I
N
N
C
C
I
I
P
P
L
L
E
E
-
In general, the command system of the installation (pressostatic or electronic) will start the
condensers fans step by step, according to the condensing pressure.
-
In some installation, motors are driven in speed variation, totally, or partially.
E
E
L
L
E
E
C
C
T
T
R
R
O
O
N
N
I
I
C
C
C
C
O
O
M
M
M
M
U
U
T
T
A
A
T
T
I
I
O
O
N
N
M
M
O
O
T
T
O
O
R
R
S
S
(
(
E
E
C
C
M
M
O
O
T
T
O
O
R
R
S
S
,
,
B
B
R
R
U
U
S
S
H
H
L
L
E
E
S
S
S
S
M
M
O
O
T
T
O
O
R
R
S
S
)
)
-
When Ec motors are installed on the condenser, each fan is equipped with a motor and its
electronic box which allows to drive the motor speed with a 0-10V external signal.
-
Those motors can have only one rotation direction fixed by construction. So, whatever phases
rotation order of the main supply, the motor will always run in the right direction.
-
Those motors are equipped with connectors and prewired cables in the aim to avoid to open the
electronic box of the motor at connecting phases.
-
Any opening of the electronic box of the motor will cancel the warranty of the motor.
-
For correct operation, the motor needs :
-
A 3 phases supply 400V
-
A command signal 0-10V
-
Some factory bridges on its terminals, according to the technical documentation.
-
According to installation specifications, the motor will only start when the command signal will
reach a voltage threshold defined.
-
And also, the motor will stop as soon as the command signal will decrease under a threshold.
R
EFER TO THE ELECTRICAL DIAGRAM AND THE SPECIFIC MANUAL IF NEEDED
.