Operating Instructions
TM-150-D-A-XL
Operation
35 / 47
V1
GB
5.5.2.1
Arrange the swing range (360°)
1.) Pull at the cord (
) to release the locking lever at the
gear ring (on the boom jib). Now the operating range of the
boom jib is movable around 360°. (
Ill. 1 +Ill. 2)
2.) The locking device releases the two bolts at the turning
points (rear and in the middle at the boom jib) see
) (
Ill. 2)
Ill. 1
Ill. 2
3.). Remove both socket pins at the crane boom (
) to
swing the boom jib around 360°. (
Ill. 3 +Ill. 4)
4.). (
Ill. 4)
Ill. 3
Ill. 4