page 12
C
O
M
M
E
R
C
I
A
L
P
R
O
D
U
C
T
S
D
I
V
I
S
I
O
N
4.
Attach the upper assembly. Diagram 3. Have an assistant hold the upright
support over the base frame bracket, while you take the following steps:
a. Remove any tape (or wire ties) that fasten the cables to the base assembly.
Ensure that the cables are out of the way while your assistant aligns the
upright support to the base frame bracket mounts.
b. Place a washer (B) on each of four socket head screws (A) and insert the
screws through the mounting holes. See Diagram 3, #2. Finger tighten.
Diagram 3
Attach the upper
assembly to the
base assembly.
Cables
Base assembly
1
2
Upright support
Diagram 4
Connect cables.
RJ45 cable
Base frame
1
2
Upright support
Base frame
bracket mounts
Screws (A) with
washers (B)
5.
Connect the cables. Diagram 4. Two different types of cables protrude from
the upright support. The RJ45 cable connects the upper display electronics to
the lower electronics and lift mechanism. The other four-prong cable connects
to the heart rate grips on the handrails and routes through the cross brace
tube. To connect the cables, perform the following:
CAUTION: Do not pull or stretch the cables while connecting them. Stretched
or damaged cables are not covered by the Precor Limited Warranty.
a. Insert the RJ45 cable into its receptacle that is attached to the side of the
upright support. Diagram 4, #1. Just like a telephone connection, a definite
“click” is heard when a good connection is made. If you do not hear a “click,”
try reinserting the cable again.
Heart rate cable
3
Base frame cross
brace tube