PD663 Loop-Powered Meter
Instruction Manual
13
Mounting
The PD663 has two mounting holes that may be used for a 1.5” pipe mounting or
wall mounting. Alternatively, the unit may be supported by the conduit using the
conduit holes provided.
It can also be pipe mounted by using the PDA6863 pipe mount kit for 2" pipe.
Refer to
Mounting Dimensions
, page 32 for details on wall or panel space
requirements
Cover Jam Screw
The cover jam screw should be properly installed once the meter has been wired
and tested in a safe environment. The cover jam screw is intended to prevent the
removal of the meter cover in a flameproof environment without the use of tools.
Using a M2 hex wrench, turn the screw clockwise until the screw contacts the
meter. Turn the screw an additional 1/4 to 1/2 turn to secure the cover. Caution:
Excess torque may damage the threads and/or wrench.
Connections
To access the connectors, remove the enclosure cover and unscrew the two
captive stainless steel screws. Remove the meter assembly from the enclosure.
Signal connections are made to a three-terminal removable connector on the
back of the meter assembly. Grounding connections are made to the two ground
screws provided on the base – one internal and one external.
WARNING:
Do not attempt to loosen or remove flange bolts while the meter
is in service.
WARNINGS
Static electricity can damage sensitive components.
Observe safe handling precautions for static-sensitive components.
Use proper grounding procedures/codes.
If the meter is installed in a high voltage environment and a fault or
installation error occurs, high voltage may be present on any lead or
terminal.