PD663 Loop-Powered Meter
Instruction Manual
16
SETUP AND PROGRAMMING
There is
no need to recalibrate
the meter for milliamps when first received
from the factory.
The meter is
factory calibrated
for milliamps prior to shipment. The
calibration equipment is certified to NIST standards.
Overview
There are no jumpers involved in the setup process of the meter.
Setup and programming is done through the front panel buttons.
After all connections have been completed and verified, apply power to the loop.
For
Quick User Interface Reference
go to page 34