PDW90 Point to Multi-Point Wireless Instruction Manual
19
Connecting Field Units to Base Station
The first thing that must be done when programming the PDW90 is connect all of the wireless field units
to the base station. Configuration of the base station is accomplished using the
PDW Manager
software,
while the individual field units may be programmed using the device buttons which are accessed by un-
screwing the enclosure cover. See Programming the Field Units on page 30 for details on field unit pro-
gramming.
After the base station has been connected to PDW Manager (see page 18), field units can be connected
to it from the
Remote Unit Configuration
tab. Select each unit from the
Unassociated Remote Units
list
and click the
Add to Client List
button.
Field units must have the same network ID and encryption settings as the base station in order to con-
nect. Each field unit must be programmed to have its own unique Modbus address.
Note: All units must be powered on in order to connect them to the base station.
www.
.com
1.800.561.8187