4-12
4. Remove the small parts from the knockout in the right side plate.
5. Route and install RJ-45 Controller Area Network (CAN) cables between the UPS cabinets. See Figure 4-7,
Figure 4-11 and Figure 4-12 for wiring information.
6. Route and install pull chain wiring (Twisted Wires 0.5-2.0 mm
2
) between the UPS cabinets and cabinet
MOBs. See Figure 4-7, Figure 4-10 and Figure 4-11 for wiring information.
7.
If wiring Mini-Slot connections, proceed to paragraph 4.5.3;
4.5.3 Installing Mini-Slot Interface Connections
For installation and setup of an Mini-Slot card, contact an service representative (see paragraph 1.8)
To install wiring:
1.
If not already installed, install the LAN drop.
2. Route and install the LAN and other cables to the appropriate Mini-Slot cards. See Figure 4-6 and Figure 4-7
for Mini-Slot communication bay locations.
3. Refer to the manual supplied with the Mini-Slot card for operator instructions.
4. Install the power terminal cover using the provided hardware.
LAN drop for connection to UPS communications card is to be supplied by
customer.
NOTE
Summary of Contents for VFI 20000-40000TAP 3/3 BI
Page 2: ......
Page 4: ......
Page 8: ...iv This page intentionally left blank...
Page 10: ...vi This page intentionally left blank...
Page 12: ...viii This page intentionally left blank...
Page 18: ...1 6 This page intentionally left blank...
Page 21: ...Section 1 Installation...
Page 22: ......
Page 46: ...This page intentionally left blank 3 24...
Page 64: ...4 18 Notes...
Page 65: ...Section 2 Operation...
Page 66: ......