1-1
Chapter 1 Introduction
The
PowerWalker VFI 3/3 Series VFI 20000-80000TAP 3/3 BE/BI
uninterruptible power supply (UPS) is a
true
online, continuous-duty, transformer-free, double-conversion, solid-state, three-phase system,
providing conditioned and uninterruptible AC power to protect the customer's load from power failures.
The
PowerWalker VFI 3/3 Series VFI 20000-80000TAP 3/3 BE/BI
online power protection system is used to
prevent loss of valuable electronic information, minimise equipment downtime, and minimise the adverse
effect on production equipment due to unexpected power problems.
The
PowerWalker VFI 3/3 Series VFI 20000-80000TAP 3/3 BE/BI
UPS continually monitors incoming
electrical power and removes the surges, spikes, sags, and other irregularities that are inherent in
commercial utility power. Working with a building's electrical system, the UPS system supplies clean,
consistent power that sensitive electronic equipment requires for reliable operation. During brownouts,
blackouts, and other power interruptions, batteries provide emergency power to safeguard operation.
The UPS is housed in a single free-standing cabinet, with safety shields behind the door for hazardous voltage
protection.
This manual is for
PowerWalker VFI 3/3
series UPS, refer to Table 9-1 for product models.
Figure 1-1 shows the
PowerWalker VFI 3/3 series
UPS.
Figure 1-1.
PowerWalker VFI 3/3 series
UPS (
VFI 20000-80000TAP
)
Startup may be performed by the customer’s qualified electrical contractor for single (not
parallel) UPS installations without any accessory cabinets.
Startup and operational checks for parallel systems or installations with accessory
cabinets must be performed by an authorised Customer Service Engineer, or the
warranty terms may become void. This service is offered as part of the sales contract
for the UPS. Contact an service representative in advance (usually a two-week notice is
required) to reserve a preferred startup date.
NOTE 1
NOTE 2
Summary of Contents for VFI 20000-40000TAP 3/3 BI
Page 2: ......
Page 4: ......
Page 8: ...iv This page intentionally left blank...
Page 10: ...vi This page intentionally left blank...
Page 12: ...viii This page intentionally left blank...
Page 18: ...1 6 This page intentionally left blank...
Page 21: ...Section 1 Installation...
Page 22: ......
Page 46: ...This page intentionally left blank 3 24...
Page 64: ...4 18 Notes...
Page 65: ...Section 2 Operation...
Page 66: ......