3
not depending on the PC setting
)
.
05 Solar priority mode
(For inverters equipped with internal MPPT Charger)
This mode is similar to Mode 03 (Battery priority Mode) but manages the
internal MPPT Charger and the Inverter .When the battery voltage is normal, the
inverter automatically turns on and the battery supply power to the load. When the
battery has low voltage (PL setting), the inverter shuts down automatically. The
second time that the battery discharge to battery low voltage shutdown (PL setting),
the inverter enters standby in and waits for the mains power or solar Charger to
recharge the battery .When the battery voltage is restored (PN setting), the inverter
will automatically turn on. But when the battery voltage is lower than the voltage set
by F4, inverter will be turned off and will be turned ON only when the mains power
returns or by hand.
In this mode, the solar charger and the AC charger are combined to supply the
charging current to the battery. The main charger will be the Solar charger and the AC
charger will supply the charging amps to reach the Max Charging amps setting (P5)
2. - Opening package / Inspection:
Before opening, check if the package is not damaged. After opening, please check
the inverter and its accessories.
Verify that the inverter has not sign of damage.
Notes:
Read the product manual carefully.
If you find damage or missing parts, please do not return the device and contact
your dealer.
Please keep the packing box and materials in case of a next shipping is needed.
This series of products is very heavy, please handle it safely.
Summary of Contents for ECO SW 10096
Page 23: ...21 ...
Page 24: ...22 ...
Page 25: ...23 ...
Page 28: ...GENERAL INSTALLATION DIAGRAM ...
Page 29: ......