17
4111-0044 — June 2021
© 2021 Systems, LLC
RCR w/Side Shift Installation Pictures
Figure 16 shows the leveler platform being installed
onto the carriage.
The forklift is positioned inside the building to allow
clearance for installation of the hinge pins. The
maintenance props remain lowered to keep the
platform upright.
Installation of RCR levelers from inside is
recommended, as combined height of leveler
and proper lifting equipment may be greater than
outside door height.
Overall length of lifting chain and bracket must be
kept to a minimum to prevent interference between
the lifting equipment and the building ceiling or
door as the dock leveler is lowered into the pit.
INSTALLATION
Figure 16
Older model shown.
Summary of Contents for RCR Series
Page 25: ...23 4111 0044 June 2021 2021 Systems LLC OPERATION This page intentionally left blank ...
Page 38: ...36 4111 0044 June 2021 2021 Systems LLC PARTS Platform Hydraulic Hoses C A G F E D B H ...
Page 58: ...56 4111 0044 June 2021 2021 Systems LLC This page intentionally left blank MISCELLANEOUS ...