![Positron Teleline 751960/13CU5 Description And Installation Manual Download Page 25](http://html1.mh-extra.com/html/positron/teleline-751960-13cu5/teleline-751960-13cu5_description-and-installation-manual_1582599025.webp)
25
300 Volt Point Location
³
Grounding the 300 V point closure
Grounding of the 300 V point closure can be accomplished utilizing a ground rod
driven within a 1.8m (6’) radius of the closure.
1. Attach a #6 AWG bare copper wire to this ground rod and route it to this same
cable closure.
2. Attach this ground wire to the cable closure bond bar.
3. All cables within this closure are to be bonded to this cable bond bar, thereby
effectively grounding them to a local ground.
Q
Do not install a bond wire to any power system multi grounded neutral
conductor or other power system apparatus at this closure.
3.3.2
Cable Pair Protectors
These units, if utilized, are provided to protect against conductor to conductor
voltage imbalance on the CO side of the Positron Equipment. Imbalances may be
present as a result of induction effects and or other energy sources during a
power system fault. The protectors used should be of a balanced three element
gas tube design.
N
OTE
Summary of Contents for Teleline 751960/13CU5
Page 2: ......
Page 6: ......
Page 7: ...Chapter 1 General Information...
Page 14: ......
Page 15: ...Chapter 2 Overview...
Page 17: ...17 Introduction Figure 1 HVI Pre configured Unit 751960 13CU5...
Page 20: ......
Page 21: ...Chapter 3 Installation...
Page 51: ...Chapter 4 Thermal Considerations...
Page 57: ...Appendix A Acronyms...