![Porter 91101-100 Installation, Operation & Maintenance Manual Download Page 13](http://html1.mh-extra.com/html/porter/91101-100/91101-100_installation-operation-and-maintenance-manual_1580727013.webp)
Page 9
FIGURE E
Threaded rod is utilized to ensure each hoist unit is installed level! Installing the unit
level ensures proper cable wind on the hoist drum. After the unit is secured in place as
shown in
Figure F
, place a level across the lower two (2) angles that comprise the
hoist frame support. Adjust the hex nuts accordingly to level the unit. Do not use the
level on the top cover. The top cover plate may be slightly distorted, giving an
inaccurate reading. Be sure to check for levelness in each direction, utilizing the two
(2) angles of the frame weldment as a base.
A one-inch (1”) space between the top cover of the hoist unit and the overhead
structure is required to provide wiring access by the electrician (again, refer to
Figure
F
).
Repeat the sequence in Step 5 for the second hoist unit.
Note
: all threaded rods
require a double nut connection, as detailed in
Figure F
.
FIGURE F
Summary of Contents for 91101-100
Page 4: ......
Page 18: ...Page 14 FIGURE J POWER SOURCE ...
Page 19: ...Page 15 FIGURE K BEFORE ...