Page 7
FIGURE A
CORRECT!
FIGURE B
INCORRECT!
3. ANCHOR LOCATIONS FOR OVERHEAD SUPPORTED UNITS
(Go to Step 4 if units are wall mounted.) The exact location of anchoring is included on
the custom installation print provided with each product. Four (4) high strength
eighteen-inch (18”) long rods are provided to suspend each hoist frame from the
structural. A typical installation is shown in
Figure C
.
FIGURE C
Summary of Contents for 91101-100
Page 4: ......
Page 18: ...Page 14 FIGURE J POWER SOURCE ...
Page 19: ...Page 15 FIGURE K BEFORE ...