HYDRAULIC POWER UNIT G-18S10-54-W
OPERATION MANUAL
19
6
Commissioning and operation
6.1
General information for start-up
DANGER
Incorrect operation of the machine or disregard of safety instructions may lead to endangerment of
persons or damage to the machine.
-
Familiarize yourself with the complete instruction for use before beginning work on the machine. Pay
particular attention to chapter 3!
NOTICE
A thorough, visual inspection of the machine is to be carried out by the operator before start-up.
Start-up of the machine may only be carried out by qualified specialist personnel. The start-up engineer must be acquainted with
the machine. Requirements for start-up are:
-
the Hydraulic Power Unit have been tested and is ready for operation
-
safety devices have been tested and are ready for operation
-
all detachable connections have been checked and tightened if necessary
6.2
Operation
A visual inspection is to be carried out before beginning work. In the event of damage, no work may be carried out. Install hydraulic
hoses away from walking and transport routes. Ensure that hydraulic hoses are not installed over sharp edges. Make sure that the
environment is well lit; set up additional work lights if necessary.