POM2-3333
Merger Unit Test User
Manual
25
3.3.3.5 Test completed
When the accuracy test has been completed, press “ESC” in the software or
on the
tester or “ESC” on the external PC to stop the test.
If there are new test items to be tested (The wiring connection is the same), the previous
steps can be omitted, only need to switch
Testing data observation
. If there are new test
items to be added, press
after the new testing page is switched.
Note: After above test, the button
will turn grey. If this test result is not
satisfied to have a test again, press button
after the software is
stopping. Then the button
will be available. Press this button again to
restart the test and obtain the result.
3.3.3.6 Report
When all test items are finished, or the selected items are completed, press
to get
the word format report.
3.3.4 Notice
1. While making SMV testing, frame drop, SN Jump, repetition, serial number deviation,
recovery time with communications timeout and recovery time with communications
interruption cannot be 0.
2. In MU without synchronization signal, it is normal with out-of-step. Otherwise, it is
abnormal.
3. If there is quality abnormal, the user can select Receive SMV in parameters, the users
can analyze the message structure to conclude the reason. Press Fresh to get the
newest message.