
30
Diagram with pelet boiler and with heat buffer
5
, where: 1 – pellet boiler, 2 – boiler pump, 3 – HUW circulation
pump, 4 – upper sensor temperature buffer, 5 – center sensor temperature buffer, 6 – lower sensor temperature solar, 7
– water temperature sensor for charging buffer pump solar, 8 – H2/H3 CIRCUIT regulated circuit water temperature
sensor, 9 – H2/H3 circuit pump, 10 – electrical servo of H2/H3 CIRCUIT regulated heat circuit, 11 –solar collector
temperature sensor, 12 – solar, 13 – heat buffer, 14 – solar pump.
PROPOSED SETTINGS:
Parameter
Setting
MENU
Hydraulic diagram
4
menu
service settings
System
Pump starting temperature
55
C
menu
service settings
System
Minimum temperature
60
C
menu
service settings
System
Main heat source
Hysteresis heat source
5
C
menu
service settings
System
Main heat source
Selection heat source
boiler pellet menu
service settings
System
Main heat source
Pump operation extension
5min.
menu
service settings
System
Main heat source
Mode
ON
menu
service settings
Buffer
Selection
OFF
menu
service settings
System
Additional heat source
Description: The pump (9) starts after exceeding the pump starting temperature. The boiler (1) will switch off after
loading the buffer tank (13). The boiler (1) have to be equipped with security measure against cold water returning to
the boiler e.g. thermostatic 3-way valve. The pump (2) starts together with the boiler (1) and turns off after turning off
the boiler (1), but with 5 min. time delay.
5
The hydraulic diagram shown does not replace the central heating system design and is used for illustrative purposes
only!
Summary of Contents for ecoMAX920P2-I
Page 2: ......
Page 6: ...6...
Page 7: ...CONTROLLER OPERATION MANUAL ecoMAX920P2 I FOR THE USER...
Page 18: ......
Page 19: ...CONTROLLER ASSEMBLY AND SERVICE SETTINGS MANUAL ecoMAX920P2 I FOR THE INSTALLER...
Page 47: ...47...
Page 48: ...ul Wsp lna 19 Ignatki 16 001 Kleosin Poland plum plum pl www plum pl...