ANCHORING
Items for this STEP:
(1) Playset Anchors PS 7690 (sold separately)
(2)
³₈
" x 2" lag screws (provided with PS 7690)
(2)
³⁄₈
" washers (provided with PS 7690)
At locations shown screw Playset Anchors into
ground by hand (a long screwdriver will help).
Use the anchor as a drill guide and drill a
¹⁄₄
" hole 1"
deep into the board. Attach with
³₈
" x 2" lag screw
and
³₈
" washer.
Note: If soil conditions permit anchors to be
pulled out easily, such as in sandy soil
conditions, cementing is required. If your
ground is too hard to screw in the anchors
you can remove the earth with a shovel.
Install the anchors and compact the earth as
you replace it. Anchors must be placed below
the level of the shock-absorbing surfacing
material to prevent tripping or injury resulting
from a fall.
Reminder:
Be sure to install proper shock-
absorbing surfacing material. Refer to the
Safety Guidelines at the beginning of this
plan.
31
LT 6456 Climbing Bar Instructions_AS Instructions '04 R1 2/24/10 3:04 PM Page 31