background image

2 x 4 board

Corner post

Corner Post

4 x 4 board

PRE-DRILL LAG SCREW DIRECTIONS

posts with an 11/64" drill bit.  Remove the 

holes in the 4 x 4 board into the corner 

right.  Install the 4 x 4 board.

to drill the holes to a total depth of 2-5/16" as shown at 

4 x 4 board.  Continue to drill the holes to 

a total depth of 2-13/16" as shown at the 

the right.  Install the 2 x 4 board.

board into position.  Spot drill through the 

below.  Place the board into position.  Spot Drill through 

the holes in the 2 x 4 board into the corner posts with 

Example 5/16" diameter x 3-1/2" lag screw

the right.  Install the 2 x 4 board.

This would be like the 2 x 4 board installation shown 

drill the holes to a total depth of 2-5/16" as shown at 

an 9/64" drill bit.  Remove the 2 x 4 board.  Continue to 

Example: 3/8" diameter x 3-1/2" lag screw
This would be like the 2 x 4 board installation shown 

below.  Place the board into position.  Spot Drill through 

the holes in the 2 x 4 board into the corner posts with 

an 11/64" drill bit.  Remove the 2 x 4 board.  Continue 

Example 3/8" diameter x 5" lag screw
This would be like the 4 x 4 board 

installation shown below.  Place the 

LAG SCREW DIAMETER

DRILL BIT SIZE

5/16" DIAMETER

9/64"

3/8" DIAMETER

11/64"

Pre-drilling holes for lag screws will make it easier to drive the screws in by hand.

"Jobber" length drill bits are available in sizes that are longer than standard drill bits and 

those are ideal for the job.  When using the drill bit you will have to "spot" drill the post 

and then remove the board you are attaching to finish drilling the hole.

Pay attention to the DIAMETER of the lag screw you are installing

.  Your playset may 

come with two different diameter lag screws.  Each diameter will require a different size 

drill bit.  When installing lag screws 

DO NOT OVERTIGHTEN.

Corner Post

2 x 4 board

4 x 4 board

Corner Post

7 "

 3 16

"

16

 2 5

16

15

 4

 2 13

16 "

12

Summary of Contents for Riviera Playhouse 1536

Page 1: ...ht 2016 PlayNation Play Systems Inc All Rights Reserved 190 Etowah Industrial Court Canton GA 30114 www playnation com Riviera Playhouse Model 1536 BOXES 1518 1528 1529 1536 Accessory Box 52 3036 W 52...

Page 2: ...that are missing or damaged is use our Quick Response Center located at www playnation com support DO NOT RETURN THIS PRODUCT TO THE RETAILER OR CONTACT THE RETAILER DIRECTLY THE RETAILER DOES NOT STO...

Page 3: ...separate from those included with one of our swing set packages have a one year limited warranty Cosmetic imperfections and natural tendencies of wood such as peeling splintering warping seasonal chec...

Page 4: ...is warranty is void if the product is used in a commercial institutional or multi family setting This warranty does not cover normal wear and tear or a products that have been damaged by acts of God a...

Page 5: ...screw heads should be checked regularly for tightness The ground ladder rope ladder slide swings and other areas where children spend a majority of their playtime should be checked more frequently Pl...

Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Page 7: ...________________________________________________________________________________ Comments ________________________________________________________________________________________________ _____________...

Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Page 9: ...ed product will penetrate and protect the lumber better than a water based product Because climate conditions can vary drastically from region to region we suggest asking the product covering speciali...

Page 10: ...ific model http www playnation com warranty html NOTE Your children s safety is our 1 concern Observing the following statements and warnings reduces the likelihood of serious injury Please review the...

Page 11: ...Model 1536 BOXES 1518 1528 1529 1536 ACCESSORY BOX REV 11 17 2016...

Page 12: ...e Assembly Step 16 Bottom Wall Board Step 17 Attaching Front Gable Step 18 Wall Panel Supports and Roof Finishers Steps 19 20 Roof Battens Step 21 Wall Panel Boards and Roof Gable Boards Steps 22 23 D...

Page 13: ...children s clothing These things can get caught on playground equipment and strangle a child Teach children not to climb on the playhouse railings serving window window or roof Teach children not to a...

Page 14: ...using a non lead based paint meeting the requirements of Title 16 C F R Part 1303 These requirements are available at http www cpsc gov Inspect wood parts monthly The grain of the wood sometimes will...

Page 15: ...oose fill surfacing materials are acceptable Surfacing materials are acceptable such as the types and depths shown in the table Fall Heights and Materials Type Of Material 6 in depth 9 in depth 12 in...

Page 16: ...re the ground around the outside edges of the sandbox boards on the high side of the fort This is the area that will be dug in Make sure to score deep enough the scored lines will be your digging temp...

Page 17: ...parts that are structurally defective We use a high quality lumber in our structures however you should inspect each part for splinters or rough spots and sand them smooth to prevent injury After fami...

Page 18: ...s EXAMPLE OF OFFSET HOLES UP EXAMPLE OF OFFSET HOLES DOWN Counter sunk holes Many of the parts that will be used have counter sunk holes A counter sunk hole is one that surrounds one side of a through...

Page 19: ...nut until the face of the T nut is flush to the wood This picture shows the T nut inserted and installed flush to the wood This picture shows an end view of the T nut installed flush to the wood WARN...

Page 20: ...RST STEP IN OUR ASSEMBLY INSTRUCTIONS IS TO INSERT T NUTS INTO THE CORNER POSTS A T NUT IS A FASTENER WHICH IS THREADED ON THE INSIDE AND IT FUNCTIONS JUST LIKE A STANDARD HEX NUT YOU INSERT THE T NUT...

Page 21: ...rt to fit into a certain area of the play set B We need the designation to be simple The 3600 is the length of the board It means the board is 36 inches long If the code were 3625 then the board is 36...

Page 22: ...2 x 4 board installation shown below Place the board into position Spot Drill through the holes in the 2 x 4 board into the corner posts with an 11 64 drill bit Remove the 2 x 4 board Continue Exampl...

Page 23: ...LAN Playset height 83 Interior Dimensions Width 68 1 2 Depth 45 3 4 Height at front rear 55 1 2 Height at center roof peak 75 1 2 Other dimensions rounded off Door Opening 21 1 2 W x 39 3 4 H Serving...

Page 24: ...cil ___ You may need a Saw handsaw or jigsaw See Step 20 ___ Pliers and or Locking Pliers Vise Grips ___ Carpenter s Square ___ Shovel if installing outdoors KIT CONTENTS Swings Slides Accessories ___...

Page 25: ...9 1 4 3 USE THE RULER TO THE RIGHT TO MEASURE YOUR BOLTS AND SCREWS PICTURE VIEWS SHOWN ABOVE ARE 1 1 SCALE AND CAN BE USED TO MATCH BOLT AND SCREW SIZES 5 16 X 4 1 2 HEX BOLT QTY 4 2 SQUARE DRIVE TIP...

Page 26: ...GE 1 OF 1 1 16 2015 SO 2 SQUARE DRIVE BIT QTY 1 5 16 X 2 1 2 HEX BOLT QTY 2 8 9 1 4 3 2 5 6 7 USE THE RULER TO THE RIGHT TO MEASURE YOUR BOLTS AND SCREWS PICTURE VIEWS SHOWN ABOVE ARE 1 1 SCALE AND CA...

Page 27: ...URE VIEWS SHOWN ABOVE ARE 1 1 SCALE AND CAN BE USED TO MATCH BOLT AND SCREW SIZES QTY 22 8 X 1 1 4 WOOD SCREW 1529 HARDWARE PAGE 1 OF 1 1 16 2015 S O 2 SQUARE DRIVE BIT QTY 1 8 X 1 3 4 WOOD SCREW QTY...

Page 28: ...22 8 x 1 3 4 WOOD SCREW WOOD SCREW 8 x 2 10 x 3 1 2 QTY 6 1536 HARDWARE 11 0086 11 10 2016 JH 8 x 1 1 4 WOOD SCREW QTY 5 5 6 7 8 9 1 4 3 2 USE THE RULER TO THE RIGHT TO MEASURE YOUR BOLTS AND SCREWS...

Page 29: ...2 ROOF BATTEN 1 X 2 X 32 FRONT RIGHT 1 4 0875 WPB BOARD WALL PANEL 1 X 4 X 8 3 4 1 4 1225 WPB 2 2 BOARD WALL PANEL 1 X 4 X 12 1 4 1 4 1575 WPB BOARD WALL PANEL 1 X 4 X 15 3 4 1 4 2929 RFFL 1 1 FRONT L...

Page 30: ...7 8 1 4 7688 RSR 1 1 REAR ROOF STARTER 1 X 4 X 76 7 8 1 4 7688 RFR 14 REAR ROOF FINISHER 1 5 7688 RB ROOF BOARD 1 X 5 X 76 7 8 1 X 4 X 76 7 8 2 4 2275 WPSL 1 2 4 2856 CPFR SUPPORT LEFT WALL PANEL 2 X...

Page 31: ...X 11 X 46 15 16 ROOF PANEL LEFT ASSEMBLY 1 2 4 6975 RFS SUPPORT ROOF FINISHER 2 X 4 X 69 3 4 125 6 1000 RPS 2 1 SUPPORT ROOF PEAK 5 4 X 6 X 10 125 5 1081 RPPS PEAK SUPPORT ROOF PANEL 5 4 X 5 X 10 7 8...

Page 32: ...1 1 BOARD WINDOW TOP 1 X 3 X 18 1 X 3 X 34 3 4 1 3 2988 OWOS SUPPORT OUTSIDE OPEN WINDOW 1 X 3 X 29 7 8 1 3 3475 WBB 1 2 BOARD BOTTOM WINDOW 3 2 TOP BOARD 1 X 4 X 9 1 4 0900 TBW 1 4 2775 BWB WINDOW 1...

Page 33: ...RD OPEN WINDOW 1 4 5100 WB 6 2 WALL BOARD 1 X 4 X 51 1 X 4 X 29 1 2 1 6 0843 TBD2 DOOR 2 TOP BOARD 1 X 6 X 8 7 16 1 6 1020 TBD1 2 2 DOOR 1 TOP BOARD 1 X 6 X 10 3 16 1 6 1118 OWTB2 1 X 6 X 27 ARCH TOP...

Page 34: ...00 BPBD BOARD DOOR BOTTOM BOARD OPEN WINDOW TOP BOARD 1 1 WALL BOARD 1 X 6 X 51 1 X 6 X 34 BOARD TOP PANEL 2 4 7000 BWB BOTTOM PANEL 2 4 4750 TPB 2 X 4 X 47 1 2 BOARD 2 X 4 X 70 1 X 6 X 27 3 4 2 X 6 X...

Page 35: ...ENT 125 4 2838 DA 2 2 2 X 6 X 42 ROOF GABLE BOARD 2 6 4200 RGB 2 X 5 X 47 1 2 BOTTOM PANEL BOARD 2 5 4750 BPB 2 1 2 X 5 X 70 SANDBOX BOARD 2 5 7000 SB 4 X 4 X 51 1 4 FRONT CORNER POST 4 4 5125 FCP 2 2...

Page 36: ...PICTURE DESCRIPTION QTY 5 4 X 3 X 28 1 4 PANEL SLAT 125 3 2825 PS 8 26...

Page 37: ...Y 07 0027 G PLASTIC SUNBURST 2 07 0028 G 2 DORMER 1529 BOX SOLAR WALL PLASTIC FRONT ARCH UNASSEMBLED 07 0029 G DORMER 1529 BOX MANUFACTURER NOT SHOWN 09 2003 2 WINDOW LIGHT LOGO PLATE 1 2 1 PLASTIC UN...

Page 38: ...1 1 1 1EA HARDWARE KITS LEMONADE STAND SIGN 07 0024 PLASTIC WINDOW 07 0013 NOT SHOWN TOUCH UP STAIN LITTLE BOTTLE THAT IS BAGGED 1528 1518 1536 PICTURE DESCRIPTION QTY 28...

Page 39: ...LES ARE SLIGHTLY SMALL THEN REAM THEM OUT WITH A 3 8 DRILL BIT 2 FASTEN THE 2 X 5 X 47 1 2 BOTTOM PANEL BOARD OFFSET DOWN TO THE CORNER POSTS WITH 5 16 X 4 1 2 HEX BOLTS AND 5 16 WASHERS IN FRONT POST...

Page 40: ...THE BOTTOM 2 FASTEN THE 2 X 5 X 70 SANDBOX BOARD OFFSET UP TO THE CORNER POSTS WITH 5 16 X 4 1 2 HEX BOLTS AND 5 16 WASHERS WASHER 5 16 5 16 X 4 1 2 HEX BOLT FRONT CORNER POST RIGHT SIDE OFFSET UP SA...

Page 41: ...2 FASTEN THE 2 X 5 X 47 1 2 BOTTOM PANEL BOARD OFFSET DOWN TO THE CORNER POSTS WITH 5 16 X 4 1 2 HEX BOLTS AND 5 16 WASHERS HEX BOLT 5 16 WASHER RIGHT SIDE REAR CORNER POST OFFSET DOWN 5 16 T NUT 5 1...

Page 42: ...16 T NUT 4 1 2 2 X 6 X 70 BOTTOM PANEL BOARD DOOR OFFSET UP STEP 4 BACK SIDE 1 HAMMER T NUTS INTO THE CORNER POSTS HOLES THAT ARE 4 1 2 OFF THE BOTTOM 2 FASTEN THE 2 X 6 X 70 BOTTOM PANEL BOARD DOOR...

Page 43: ...UPPORT SHOULD BE EVEN OR SLIGHTLY BELOW THE EDGES OF THE ROOF SUPPORTS 4 ATTACH THE ROOF PEAK SUPPORT TO THE ROOF SUPPORTS WITH 8 X 2 WOOD SCREWS 5 REPEAT SUBSTEPS 1THROUGH 4 TO MAKE ANOTHER ROOF SUPP...

Page 44: ...THE ROOF SUPPORTS WITH TWO 8 X 2 1 2 WOOD SCREWS AT THE TOP TRIANGLE SECTION AND SIX 8 X 2 WOOD SCREWS ON THE SIDES 5 REPEAT SUBSTEPS 1 THROUGH 4 FOR THE OTHER ROOF SUPPORT ASSEMBLY WOOD SCREW 2 THRO...

Page 45: ...T WASHER ROOF SUPPORT T NUT STEP 7 ROOF SUPPORT ASSEMBLIES 1 HAMMER A T NUT INTO THE TOP HOLE ON THE INSIDE OF EACH CORNER POSTS 2 FASTEN THE ROOF SUPPORT ASSEMBLY TO THE LEFT SIDE WITH 5 16 X 4 1 2 H...

Page 46: ...T THE TOP OF THE POSTS THE POSTS NEED TO BE PARALLEL TO ONE ANOTHER IF THEY ARE NOT PARALLEL THEN LOOSEN THE HEX BOLTS AND MAKE THEM PARALLEL SQUARE COMPARE DIAGONAL DIMENSIONS WHEN THEY ARE THE SAME...

Page 47: ...SO 2 USE A 9 64 DRILL BIT TO DRILL A PILOT HOLE AT EACH LOCATION SHOWN SEE PRE DRILL LAG SCREW DIRECTIONS AT FRONT OF THE MANUAL FOR 5 16 X 3 1 2 LAG SCREWS 3 INSTALL A 5 16 X 3 1 2 LAG SCREW WITH 5 1...

Page 48: ...ISTANCE SHOULD MATCH THE BOTTOM OF THE POSTS IF THAT DISTANCE IS NOT THE SAME THEN LOOSEN THE WOOD SCREWS IN THE ROOF BOARD AND REPOSITION ON ONE SIDE UNTIL THE DISTANCES MATCH THE ROOF SUPPORT ASSEMB...

Page 49: ...ACH OTHER DUE TO WOOD MILLING VARIATIONS YOUR HOLES IN THE ROOF STARTER WILL EITHER BE CENTERED ON THE ROOF SUPPORTS OR THEY WILL BE OFFSET TOWARDS THE INSIDE OF THE ROOF SUPPORTS SLIGHTLY SUBTRACT DI...

Page 50: ...ARE DIFFICULT TO FIT THIS SHOULD PREVENT DAMAGE TO THE ROOF BOARD 1 PLACE THE 1 X 5 X 76 7 8 ROOF BOARDS ON TOP OF THE ROOF SUPPORTS FITTING THE TONGUE END INTO THE GROOVE END OF THE ROOF STARTER REA...

Page 51: ...STANCE ACROSS THE SET AT THE TOP OF THE POSTS THAT DISTANCE SHOULD MATCH THE BOTTOM OF THE POSTS IF THAT DISTANCE IS NOT THE SAME THEN LOOSEN THE SCREWS IN THE ROOF BOARD AND REPOSITION ON ONE SIDE UN...

Page 52: ...YOUR HOLES IN THE ROOF STARTER WILL EITHER BE CENTERED ON THE ROOF SUPPORTS OR THEY WILL BE OFFSET TOWARDS THE INSIDE OF THE ROOF SUPPORTS SLIGHTLY SUBTRACT DIM A FROM 76 7 8 AND THEN DIVIDE THIS NUM...

Page 53: ...TTING THE TONGUE END INTO THE GROOVE END OF THE ROOF STARTER FRONT THIS SIDE GETS SEVEN ROOF BOARDS 2 FASTEN THE ROOF BOARDS TO THE ROOF SUPPORTS WITH 1 1 2 WOOD SCREWS 1 X 4 X 76 7 8 ROOF STARTER FRO...

Page 54: ...SUNK HOLES 5 x 11 x 46 97 ROOF PANEL LEFT ASSEMBLY GAP AT THE BOTTOM PEAK SUPPORT ASSEMBLY KEEP TIGHT AT THE PEAK 2 WOOD SCREW BATTENS FASTEN THE ROOF PANEL PEAK SUPPORT TO THE ROOF PANELS USING 2 WOO...

Page 55: ...T NUT INTO EACH HOLE IN THE FRONT CORNER POSTS 2 FASTEN THE 2 X 4 X 70 BOTTOM WALL BOARD TO THE FRONT CORNER POSTS WITH 5 16 X 4 1 2 HEX BOLTS AND 5 16 WASHERS T NUT HEX BOLT 5 16 X 4 1 2 T NUT WASHER...

Page 56: ...TO TEST FIT THE 1 X 4 X 29 29 ROOF FINISHERS FRONT LEFT AND RIGHT 3 AFTER THE GABLE ASSEMBLY IS IN ITS FINAL POSITION GO INSIDE ON TOP OF THE DECK AND PULL THE GABLE ASSEMBLY TOWARDS YOU MAKING SURE I...

Page 57: ...L STEP 19 WALL PANEL SUPPORTS ROOF BOARD IN THE GABLE ASSEMBLY INSTALL A 2 1 2 WOOD SCREW IN THE HOLE 2 SLIDE THE FINISHER OUT AND THEN MAKE A MARK AT THE END OF THE TIP OF THE WALL PANEL BOARD SINCE...

Page 58: ...ABLE ASSEMBLY ROOF IF THE FINISHER STICKS OUT BEYOND THE END OF THE ROOF BOARD ABOVE IT THEN YOU WILL HAVE TO TRIM IT MARK THE END OF THE FINISHER AND CUT IT TO LENGTH IF THE FINISHER IS FLUSH TO THE...

Page 59: ...NEL CENTERED BETWEEN THE ROOF SUPPORTS FLUSH THE BOTTOM EDGE OF THE ROOF BATTEN TO THE BOTTOM EDGE OF THE SEVENTH ROOF BOARD MAKE SURE IT IS PARALLEL TO THE ROOF SUPPORTS INSERT 1 1 4 SCREWS THROUGH T...

Page 60: ...WALL PANEL BOARD THE WALL PANEL BOARD BOTTOM ANGLED END SHOULD BE PARALLEL AND 1 FROM THE SIDE EDGE OF THE GABLE ROOF SUPPORT FASTEN THE WALL PANEL BOARD WITH FOUR 1 1 2 WOOD SCREWS 3 MOUNT THE 1 X 4...

Page 61: ...DIRECTLY UNDERNEATH THE ROOF SUPPORTS 2 SECURE THE ROOF GABLE BOARD TO THE ROOF SUPPORTS WITH TWO 10 X 3 1 2 WOOD SCREWS 3 REPEAT SUBSTEPS 1 THROUGH 2 FOR THE OTHER SIDE OF THE ROOF 2 X 6 X 42 ROOF S...

Page 62: ...CKS WITH TWO 8 X 2 WOOD SCREWS 4 MOUNT THE DORMER 4 1 2 FROM THE BOTTOM EDGE OF THE SEVENTH ROOF BOARD THE DORMER MOUNTING BLOCK WILL FIT BETWEEN THE SIDES OF THE DORMER 5 ATTACH THE DORMER TO THE DOR...

Page 63: ...HE SANDBOX BOARD AS SHOWN BELOW THE BOTTOM OF THE WALL BOARDS SHOULD BE 1 3 8 ABOVE THE BOTTOM OF THE SANDBOX BOARD 3 USE A 8 X 1 3 4 WOOD SCREWS TO ATTACH THE BOARDS LEAVE 1 4 SPACES BETWEEN THE WALL...

Page 64: ...3 X 40 1 2 8 X 1 1 4 WOOD SCREW LEFT WALL INSIDE VIEW STEP 26 ATTACHING PANEL BOARD BRACE 1 PLACE THE 1 X 3 X 40 1 2 PANEL BOARD BRACE AT THE CENTER OF THE WALL BOARDS YOU ATTACHED TO THE SWING BEAM...

Page 65: ...TOP BOTTOM PANEL BOARD DOOR 2 14 1 11 1 2 STEP 27 REAR WALL BOARDS 1 PLACE WALL BOARDS ON THE REAR SIDE OF THE FORT AGAINST THE BOTTOM PANEL BOARD AND THE ROOF FINISHER SUPPORT AS SHOWN BELOW THE BOTT...

Page 66: ...E PLASTIC WINDOW PLACE WINDOW AT THE REAR OF THE PLAYHOUSE IN THE OPENING THE 1 WIDE SECTION OF THE WINDOW FRAME SHOULD BE AT THE TOP 2 ATTACH THE WINDOW WITH FOUR 8 X 1 1 4 WOOD SCREWS 8 X 1 1 4 WOOD...

Page 67: ...OM OF THE WINDOW THIS BOARD TIES THE BOARDS TOGETHER 2 FASTEN THE WINDOW BOTTOM BOARD WITH 8 X 1 1 4 WOOD SCREWS 3 PLACE THE 1 X 3 X 18 WINDOW TOP BOARD FLUSH WITH THE TOP OF THE WINDOW THIS BOARD TIE...

Page 68: ...8 X 1 3 4 WOOD SCREWS LEAVE A 1 4 GAP BETWEEN THE BOARDS AS WELL AS THE CORNER POSTS 8 X 1 3 4 WOOD SCREW 1 3 8 BOTTOM SANDBOX BOARD 1 X 4 X 27 3 4 FOUR BOARDS OPEN WINDOW ROOF GABLE BOARD WINDOW BOAR...

Page 69: ...40 1 2 FLUSH OR SLIGHTLY ABOVE STEP 31 PANEL BOARD BRACE AND TOP BOARD WINDOW 1 PLACE THE 1 X 3 X 40 1 2 PANEL BOARD BRACE FLUSH OR SLIGHTLY ABOVE THE BOTTOM BOARD OPEN WINDOW PIECES 2 FASTEN WITH 8 X...

Page 70: ...E PANEL BOARD BRACE ON THE INSIDE 2 FASTEN THE OPEN WINDOW OUTSIDE SUPPORT WITH 8 X 1 1 4 WOOD SCREWS THE PANEL BOARD BRACE DETAIL A SCALE 1 8 1 X 3 X 29 7 8 OPEN WINDOW OUTSIDE SUPPORT MAKE THE TOP O...

Page 71: ...WINDOW BOARD SHOULD BE FLUSH TO THE INSIDE OF THE PANEL BOARD BRACE 2 FASTEN THE OPEN WINDOW BOARD WITH 8 X 1 3 4 WOOD SCREWS ROUNDED CORNERS GO ON THE OUTSIDE 8 X 1 3 4 WOOD SCREW 1 X 4 X 29 1 2 OPEN...

Page 72: ...PANEL SLATS 2 INSTALL THE PANEL SLATS WITH EQUAL SPACING SEE DETAILS BELOW FOR MEASUREMENTS 3 ATTACH THE PANEL SLATS TO THE PLAYHOUSE WITH 8 X 2 WOOD SCREWS 5 4 X 6 X 28 1 4 PANEL SLAT FLUSH TO TOP 8...

Page 73: ...IGHT 5 4 X 3 X 28 1 4 PANEL SLAT FLUSH STEP 35 PANEL SLATS 1 PLACE THE 5 4 X 3 X 28 1 4 PANEL SLATS IN BETWEEN THE SLATS INSTALLED IN THE PREVIOUS STEP 2 ATTACH THE PANEL SLATS TO THE PLAYHOUSE WITH 8...

Page 74: ...OR THE SCREW HOLES FOR THE VERTICAL ACCENT BOARD AT THE CENTER DRILL 1 8 HOLES AT EACH MARK 1 USE THE DIMENSIONS ON THE LEFT TO MAKE CENTER MARKS FOR THE DIAGONAL ACCENT THEN MEASURE 1 ABOVE AND BELOW...

Page 75: ...3 8 DIAGONAL ACCENT FLUSH TO THE LEFT SIDE OF THE VERTICAL ACCENT AND LET THE TIP REST ON TOP OF THE 2 X 5 X 70 IF THE BOARD DOES NOT LOOK RIGHT THEN FLIP IT END FOR END AND PUT IT BACK INTO POSITION...

Page 76: ...PREVIOUS SUB STEP MAKE SURE THE HEAD OF THE SCREW IS STICKING OUT ABOUT 3 8 FROM THE OUTSIDE FACE OF THE WALL PANEL BOARD 3 MOUNT THE SOLAR WALL LIGHT ONTO THE WALL USING THE HEAD OF THE WOOD SCREW A...

Page 77: ...E ROOF GABLE BOARD AND MAKE A MARK ON THE BOTTOM OF IT CENTER THE MARK 2 PREDRILL A SMALL 1 16 HOLE AT EACH MARK 3 INSTALL A HOOK IN EACH HOLE 16 1 4 16 1 4 HOOKS ROOF GABLE BOARD A ROOF GABLE BOARD H...

Page 78: ...DE STAND SIGN 1 CUT TWO LENGTHS OF CHAIN TO 3 1 4 FROM THE PIECES PROVIDED 2 HANG ONE END OF THE CHAIN ON THE END OF THE HOOK PLACE THE OTHER END THROUGH THE HOLE ON THE LEMONADE STAND SIGN PLACE THE...

Page 79: ...LOGO PLATE 1 PLACE THE MANUFACTURER LOGO PLATE ON THE 2 X 6 ROOF GABLE BOARD 2 FASTEN THE LOGO PLATE TO THE BOARD WITH 8 X 1 WOOD SCREWS STEP 41 LOGO PLATE 69...

Page 80: ...APPENDIX 70...

Page 81: ...TURE VIEWS SHOWN ABOVE ARE 1 1 SCALE AND CAN BE USED TO MATCH BOLT AND SCREW SIZES QTY 22 8 X 1 1 4 WOOD SCREW 1529 HARDWARE PAGE 1 OF 1 1 16 2015 S O 2 SQUARE DRIVE BIT QTY 1 8 X 1 3 4 WOOD SCREW QTY...

Page 82: ...10 1355 DS DORMER MOUNT CHIMNEY FRONT 2 10 1500 CRS ASSEMBLY 4 4 DORMER ROOF 2 17 1850 DSRA ASSEMBLY DORMER SUNRAY 2 13 1828 DRPA PANEL ASSEMBLY RIGHT ASSEMBLY ASSEMBLY 2 3 1150 DM DORMER SIDE 2 2 CHI...

Page 83: ...2 3 0675 CMB 1 SIDE ASSEMBLY CHIMNEY LEFT 2 8 0700 CRA ASSEMBLY CHIMNEY REAR 2 10 1500 CLS 1 CHIMNEY MOUNTING BLOCK 1 PICTURE DESCRIPTION QTY...

Page 84: ...ND TWO DORMER SUNRAY ASSEMBLIES 3 PLACE THE TWO DORMER SUNRAY ASSEMBLIES BETWEEN THE DORMER SIDE LEFT ASSEMBLY AND DORMER SIDE RIGHT ASSEMBLY ONE DORMER SUNRAY ASSEMBLY FLUSH TO THE FRONT FLAT END OF...

Page 85: ...WINDOW MUST BE RESTING AGAINST THE DORMER SIDES BATTENS 2 MAKE SURE THE HOLES ON THE DORMER WINDOW ARE CENTERED WITH THE DORMER SIDES BATTENS AND THE DORMER SIDES ARE FLUSH TO THE SIDE EDGES OF THE DO...

Page 86: ...PANEL ASSEMBLIES 2 PLACE ONE DORMER ROOF PANEL ASSEMBLY ON TOP OF THE DORMER SUNRAY ASSEMBLIES THE ROOF PANEL BOARDS MUST OVERHANG EQUALLY OFF THE FRONT AND BACK MAKE SURE THE PRE DRILLED HOLES ON TH...

Page 87: ...IDES OF THE CHIMNEY WITH A 2 WOOD SCREW 1 FIND THE REAR AND RIGHT SIDE OF THE CHIMNEY 2 ATTACH THE REAR AND RIGHT SIDES OF THE CHIMNEY WITH A 2 WOOD SCREW CHIMNEY REAR USE A 2 WOOD SCREW IN THIS LOCAT...

Page 88: ...5 CHIMNEY 1 ATTACH THE CHIMNEY SIDES FROM THE PREVIOUS SIDES TO FORM THE CHIMNEY WITH 2 AND 1 1 4 WOOD SCREWS USE A 2 WOOD SCREW IN THIS LOCATION EACH SIDE USE 1 1 4 WOOD SCREWS IN THIS LOCATION EACH...

Page 89: ...NG BLOCK TO THE ROOF WITH 1 1 2 WOOD SCREWS YOU CAN PLACE THE BLOCK AT ANY DESIRED PLACE ON THE ROOF USE THE DIAGRAM BELOW AS A GUIDE AS TO WHERE YOU MIGHT INSTALL YOUR CHIMNEY 2 AFTER INSTALLING THE...

Reviews: