5/16" X 4-1/2" HEX BOLT
T-NUT
5/16" WASHER
FRON
T OF P
LAY SET
T-NUT
5/16" WASHER
(FRONT POSITION)
LEFT CORNER POST
5/16" X 4-1/2" HEX BOLT
2 X 6 X 47-3/8"
END SANDBOX BOARD
(HOLES OFFSET DOWN)
2 X 6 X 47-3/8"
END SANDBOX BOARD
(HOLES OFFSET UP)
STEP 1: LEFT CORNER POST (FRONT POSITION)
AND SAND BOX BOARDS
1: USE A HAMMER TO SEAT THE T-NUTS AFTER INSERTING THEM INTO THE HOLES SHOWN IN THE
DIAGRAM BELOW.
2: ATTACH THE 2 X 6 X 47-3/8" END SAND BOX BOARD (HOLES OFFSET DOWN) TO THE FRONT SIDE
OF THE LEFT CORNER POST USING ONE 5/16" X 4-1/2" HEX BOLT AND 5/16" WASHER.
3: ATTACH THE 2 X 6 X 47-3/8" END SAND BOX BOARD (HOLES OFFSET UP) TO THE LEFT SIDE OF
THE LEFT CORNER POST USING ONE 5/16" X 4-1/2" HEX BOLT AND 5/16" WASHER.
31