
Step4:
Connect the Switch to network devices.
A.
Connect one end of a standard network cable to the 10/100/1000 RJ-45 ports on the front of the
Switch
B.
Connect the other end of the cable to the network devices such as printer servers, workstations
or routers…etc.
"
Note
:
Connection to the Switch requires UTP Category 5 network cabling with RJ-45 tips. For more
information, please see the Cabling Specification in Appendix A.
Step5:
Supply power to the switch.
A.
Connect one end of the power cable to the switch.
B.
Connect the power plug of the power cable to a standard wall outlet.
When the switch receives power, the Power LED should remain solid Green.
2.2.2 Rack Mounting
To install the switch in a 19-inch standard rack, please follows the instructions described below.
Step1:
Place the switch on a hard flat surface, with the front panel positioned towards the front side.
Step2:
Attach the rack-mount bracket to each side of the switch with supplied screws attached to the
package.
Figure 2-5 shows how to attach brackets to one side of the switch.
Figure 2-5
Attach brackets to the switch.
Caution:
You must use the screws supplied with the mounting brackets. Damage caused to the parts by using
incorrect screws would invalidate the warranty.
Step3:
Secure the brackets tightly.
Step4:
Follow the same steps to attach the second bracket to the opposite side.
Step5:
After the brackets are attached to the Switch, use suitable screws to securely attach the brackets
to the rack, as shown in Figure 2-6