Pitco L20-281 Installation And Operation Manual Download Page 3

1

L20-2

81

 rev

 0 (4/30/05)

INSTALLATION

Although it is possible for you to install and set up your new fryer, it is STRONGLY recommended that you have it done
by qualified professionals.  The professionals that install your new fryer will know the local building codes and ensure
that your installation is safe.

WARNING

DO NOT obstruct the flow of combustion/ventilation or air openings around the
fryer.  Adequate clearance around the fryer is necessary for servicing and proper
burner operation.  Ensure that you meet the minimum clearances specified in this
manual.

Installation Clearances

The fryer needs clearance around it for proper operation.  Adequate clearances allow for servicing and proper burner
operation.  The clearances shown below are for cooker installation in combustible and noncombustible construction.

Combustible

Non-Combustible

Construction

Construction

Back

6''

0''

Sides

6''

0''

Floor - Combustible

9''

9''

In addition to the clearances required for proper fryer operation, there must be at least 21 inches of aisle space in front
of the fryer to remove/install the filter pan/module.

WARNING

The fryer must be properly restrained to prevent movement or tipping.  This restraint must prevent the fryer from

movements that would splash hot liquids on personnel, which could cause severe burns or injuries.  Always wear oil

proof gloves when moving or handling equipment or hot liquids.

Leveling

When you receive your fryer it is completely assembled.  The fryer will need to be leveled once it is in place.  Leveling
the fryer is done with a large pair of water pump pliers.  The casters provide the necessary height to meet sanitation
requirements and assure adequate air supply to the burner.

a.  Adjust the height and level the fryer by adjusting the leveling devices on the caster with the water pump
     pliers.
b.  Move the fryer to the desired location and lock the wheels using the locking devices on the sides of the
     casters.
c.  Once the unit is in place, check and readjust the levelness as necessary.

CHECKING YOUR NEW FRYER

Your new fryer has been carefully packed into one crate.  Every effort has been made to ensure that your fryer is
delivered to you in perfect condition.  As you unpack your new fryer, inspect each of the pieces for damage.  If something
is damaged, DO NOT sign the bill of lading.  Contact the shipper immediately, the shipper is only responsible for 15
days after delivery.  Check the packing list enclosed with your fryer to ensure that you have received all of the parts
to the fryer.  If you are missing any parts, contact the dealer from whom the fryer was purchased.

CAUTION

To prevent equipment damage, don't tilt the fryer onto any two of it's casters or pull the unit by the flue

vents.

Locate your Pitco Frialator warranty and fill in the serial number of the fryer and the date received.  You will find the
serial number on the plate inside the door.  Put your warranty card in a safe place for future reference.  DO NOT return
the card to Pitco Frialator.

ENGLISH

Summary of Contents for L20-281

Page 1: ...e this information and retain this manual for the life of the equipment Model __________________________ Serial __________________________ Date Purchased ___________________ Installation and Operation...

Page 2: ...rovided to limit the movement of this appliance without depending on the gas line connection Single appliances equipped with legs must be stabilized by installing anchor straps All appliances equipped...

Page 3: ...is completely assembled The fryer will need to be leveled once it is in place Leveling the fryer is done with a large pair of water pump pliers The casters provide the necessary height to meet sanita...

Page 4: ...when pressure is applied ELECTRICAL CONNECTION The electrical service used by the fryer must comply with local codes If there are no local codes that apply refer to the National Electrical Code NEC A...

Page 5: ...s a list of reference documents that provide guidance on ventilation and fire safety systems This table is notnecessarilycomplete Additionalinformationcanbeobtained fromCSAInternational 8501EastPleasa...

Page 6: ...te WARNING DONOTTURNCOMBINATIONGASVALVEKNOBTOTHE ON POSITIONUNTIL VESSELISFULLOFWATERORSHORTENING TURNINGTHEKNOBTO ON WITHVESSEL EMPTYWILLDAMAGETHEVESSELORCOMPONENTSANDVOIDWARRANTY INITIALCLEANING Whe...

Page 7: ...ndcompletelypackfrytankuptooillevelmarkwith cubes making sure there are no air pockets c Computer Controller Press the button on the controller panel to turn fryer ON Note if using solid shortening en...

Page 8: ...n is only large enough to hold the contents of one 1 tank at once during the filter process d When the tank is empty close the green handled drain valve Open the red handled return valve to the tank y...

Page 9: ...debriswhichcouldcausethepaperandholddownring not to seat properly Place the Paper Support Screen in the bottom of the pan Place filter Paper or Pad over screen making sure that there is an equal amoun...

Page 10: ...from the fryer WARNING Do not use the filter pan to drain cleaning water into The only way to remove liquid from the filter pan is via the filter pump Do not use the filter pump to pump water Water ca...

Page 11: ...his information and retain this manual for the life of the equipment Model __________________________ Serial __________________________ Date Purchased ___________________ Manuel d Installation Et de F...

Page 12: ...Toute mauvaise installation alt ration reparation et tout mauvais r glage ou entretien risque de provoquer des d g ts mat riels des blessures graves voire la mort Veuillez lire attentivement les manue...

Page 13: ...gants tanches l huile lorsque vous transportez ou d placeztoutappareilouliquidechaud Mise niveau Votre friteuse est d j compl tement assembl e sa r ception Une fois en place la friteuse doit tre mise...

Page 14: ...ue national des tats Unis NEC et aux normes ANSI NFPA pour l installation lectrique Au Canada reportez vous la norme CSA C22 1 et la r glementation de votre localit Les diagrammes dec blagessontvisibl...

Page 15: ...entilation et les syst mes de protection contre les incendies Cette liste n est pas compl te Il vous est possible d obtenir des informations suppl mentaires aupr s de l CSA International 8501 East Ple...

Page 16: ...elafriteuseestexp di e ellecomportedenombreusespi cesrecouvertesd unefinepelliculed huileafind assurer leur protection Avant que la friteuse ne soit pr te tre utilis e elle doit tre nettoy e Vous reti...

Page 17: ...EMENT Toutefriteuse gaz roulettesdoit tre quip ed undispositifderetenue Cedispositifdes curit doit treraccord toutmomentafinquelafriteusesoitraccord e laconduited arriv edegaz Sipouruneraisonquelconqu...

Page 18: ...tion d huile REMARQUE Ce bac de filtrage ne peut accueillir le contenu d une seule cuve la fois lors du filtrage d Apr s avoir vid la cuve fermez le robinet de purge vert Ouvrez la vanne de retour rou...

Page 19: ...de la bague de retenue Placez le tamis du support du papier sur le bas du r cipient du filtre Placez le papier ou le tampon du filtre sur le tamis en veillant ce que chaque c t comporte une certaine...

Page 20: ...rez le de la friteuse AVERTISSEMENT Nepasutiliserlebacdefiltrageafindevidangerl eaudenettoyage Retirezleliquidedubacde filtrageparl interm diairedelapompedefiltrage Nepasutiliserlapompedefiltrageafind...

Reviews: