Test operation
102
Installation
11 Test operation
11.1 The test operation must be carried out after the entire installation has been
completed.
11.2 Please confirm the following points before the test operation.
The indoor unit and outdoor unit are installed properly.
Tubing and wiring are correctly completed.
The refrigerant pipe system is leakage-checked.
The drainage is unimpeded.
The ground wiring is connected correctly.
The length of the tubing and the added stow capacity of the refrigerant have been recorded.
The power voltage fits the rated voltage of the air conditioner.
There is no obstacle at the outlet and inlet of the outdoor and indoor units.
The gas-side and liquid-side stop values are both opened.
The air conditioner is pre-heated by turning on the power.
11.3 Test operation
Set the air conditioner under the mode of "COOLING" by remote controller, and check the following points.
Indoor unit
Whether the switch on the remote controller works well.
Whether the buttons on the remote controller works well.
Whether the air flow louver moves normally.
Whether the room temperature is adjusted well.
Whether the indicator lights normally.
Whether the temporary buttons works well.
Whether the drainage is normal.
Whether there is vibration or abnormal noise during operation.
Outdoor unit
Whether there is vibration or abnormal noise during operation.
Whether the generated wind, noise, or condensed of by the air conditioner have influenced your
neighborhood.
Whether any of the refrigerant is leaked.
Summary of Contents for LISAS-B-1403
Page 10: ...Features 12K 18K 8 Indoor Units ...
Page 15: ...Features 24K 36K Indoor Units 13 ...
Page 18: ...Service Space 16 Indoor Units 4 Service Space ...
Page 31: ...Wiring Diagrams Indoor Units 29 ...
Page 46: ...Wiring Diagrams 44 Indoor Units 4 Wiring Diagrams UB012GMFI16MLD UB018GMFI16MLD ...
Page 47: ...Wiring Diagrams Indoor Units 45 UB024GMFI16MLD UB036GMFI16MLD UB048GMFI16MLD ...
Page 52: ......
Page 55: ...Dimensions Indoor Units 53 2 Dimensions 16 Drain pipe 195 Hanging arm Unit mm 700 600 210 ...
Page 56: ...Service Space 54 Indoor Units 3 Service Space ...
Page 57: ...Wiring Diagrams Indoor Units 55 4 Wiring Diagrams FB012GMFI16MLD ...
Page 61: ...Field Wiring Indoor Units 59 9 Field Wiring MFAU 12HRFN1 M ...
Page 67: ...Wiring Diagrams Outdoor Units 65 4 Wiring Diagrams YN012GMFI16RUD YN018GMFI16RUD ...
Page 68: ...Wiring Diagrams 66 Outdoor Units YN024GMFI16RUD ...
Page 69: ...Wiring Diagrams Outdoor Units 67 YN036GMFI16RUD YN048GMFI16RUD ...
Page 125: ...Troubleshooting Electrical Control System 123 2 4 1 2 Outdoor unit malfunction ...
Page 131: ...Troubleshooting Electrical Control System 129 2 4 4 3 E2 malfunction Only for 12 18K ...
Page 132: ...Troubleshooting 130 Electrical Control System 2 4 4 4 E2 malfunction For 24 48K ...
Page 133: ...Troubleshooting Electrical Control System 131 2 4 4 5 E3 malfunction ...
Page 134: ...Troubleshooting 132 Electrical Control System 2 4 4 6 E4 malfunction ...
Page 136: ...Troubleshooting 134 Electrical Control System 2 4 4 8 E6 malfunction Only for 36K 48K ...
Page 138: ...Troubleshooting 136 Electrical Control System 2 4 4 10 P1 malfunction Only for 36K 48K ...
Page 139: ...Troubleshooting Electrical Control System 137 2 4 4 11 P2 malfunction Only for 36K 48K ...
Page 140: ...Troubleshooting 138 Electrical Control System 2 4 4 12 P3 malfunction ...