Table 6 Job Set Up
Task number
Item Name
Task Description Data Module
Reference
Signature/Stamp Inspection
25-20/298
Passenger seats Remove as nec-
essary to do the
inspection
12-B-25-21-01-
00A-920A-A
or
12-B-25-22-01-
00A-920A-A
27-50/143
Flaps
Lower to 40° as
necessary to do
the inspection
-
71-00/287
Power plant
Do an inspec-
tion ground run
as necessary. Re-
cord any defects.
Note
A pre-inspection
ground run is not
a prerequisite
but may be use-
ful to determine
any repair work
needed to main-
tain the airwor-
thiness of the
aircraft.
71-10/207
Engine cowlings
ENG 43AL and
ENG 43AR
Open and exam-
ine, particularly
for condition of
rubbing strips and
fasteners. Lubri-
cate the hing-
es with a mini-
mum of material
P10-001.
-
3
Do the job close up as necessary to do the scheduled / unscheduled maintenance. Refer to Table 7
PC-12/47E AMM Doc No 02300, ISSUE 01 REVISION 27 MSN 545, 1001-1719, 1721-1942
12-B-AM-00-00-00-I
UNCLASSIFIED
Effectivity: All
12-B-05-20-00-00A-913A-A
UNCLASSIFIED
04.12.2021 Page 3