
TIME LIMITED INSPECTION REQUIREMENTS
SCHEDULED INSPECTIONS
Table of Contents
Page
TIME LIMITED INSPECTION REQUIREMENTS - SCHEDULED INSPECTIONS....................
Index of Tables
Page
1
2
3
4
5
6
7
- Time Limited Inspection Requirements - RVSM Aircraft......................................
8
References
Table 1 References
Data module/Technical publication
Title
CORROSION CONTROL - MAINTENANCE PRACTICES
PRESSURIZATION CONTROL (1001 - 1719) - ADJUST-
MENT/TEST
NEGATIVE PRESSURE RELIEF VALVE - EXAMINE
OVERTEMPERATURE SWITCH - ADJUSTMENT/TEST
VAPOUR CYCLE COOLING SYSTEM - ADJUSTMENT/TEST
COMPRESSOR DRIVE MOTOR - INSPECTION/CHECK
DUCT OVERTEMPERATURE SWITCH - ADJUST-
MENT/TEST
LEAD ACID BATTERY - REMOVAL/INSTALLATION
NI-CAD BATTERY - REMOVAL/INSTALLATION
HEATED NI-CAD BATTERY - REMOVAL/INSTALLATION
EMERGENCY POWER SUPPLY (EPS) SYSTEM - REMOV-
AL/INSTALLATION
EXECUTIVE TRIM - REMOVAL/INSTALLATION
STANDARD TRIM - REMOVAL/INSTALLATION
PC-12/47E AMM Doc No 02300, ISSUE 01 REVISION 27 MSN 545, 1001-1719, 1721-1942
12-B-AM-00-00-00-I
UNCLASSIFIED
Effectivity: All
12-B-05-10-20-00A-281A-A
UNCLASSIFIED
07.02.2022 Page 1