1. Installation declaration
37
D
e
u
ts
ch
E
n
g
li
sh
Fr
a
n
ça
is
E
sp
a
ñ
o
l
It
a
li
a
n
o
The manufacturer or the person authorised are obliged to hand over the special documents for
the partially completed machine to the national authorities on reasoned request. This transfer is
carried out in agreement, in electronic or paper format.
The commercial protective rights remain unaffected by this.
Important note! The partially completed machine must only be put into operation once, if re-
quired, it has been determined that the machine in which the partially completed machine is to be
installed complies with the regulations of this guideline.
Minden / 27.04.2016
Technical Manager
Place / Date
Signature
Signatory information
Minden / 27.04.2016
Managing Director
Place / Date
Signature
Signatory information
Summary of Contents for Rose+Krieger RKPowerlift M Memory
Page 162: ...7 Cicli di durata 162...