AXL F SSDO8/3 1F
70
PHOENIX CONTACT
106888_en_01
A 1
Planning
Checklist for planning the use of the module
Device type/equipment identification
Version: HW/FW
Date
Test engineer 1
Test engineer 2
Comment
No. Requirement (mandatory)
Yes
Comment
1
Has the current module user manual been used as the basis for
planning?
Revision:
2
Are the actuators approved for connection to the module (according to
the technical data and parameterization options)?
3
Has the power supply been planned according to the specifications for
the protective extra-low voltage in accordance with PELV?
4
Has the power supply of U
O
and U
BK
from a power supply unit been
planned?
5
Is external protection of the module planned (according to the
specifications in this user manual for supply voltage U
O
)?
6
Are measures planned to prevent simple tampering?
7
Are measures planned to prevent connectors being mixed up?
8
Are requirements for the actuators and cable installation observed
according to the SIL/SILCL/Cat./PL to be achieved and is the
implementation planned?
9
Are the specifications for the parameterization for each channel
defined?
10
Have test intervals been defined for testing the shutdown capability of
the actuators, if this is required to achieve a SIL/SILCL/Cat./PL?
11
Has it been ensured that any person intentionally starting hazardous
movements can only do so with a direct view of the danger zone?
12
Does the planned use correspond to the intended use?
13
Are the ambient conditions as well as the maximum mechanical load
observed according to the technical data?
14
Have test intervals been defined and has the maximum duration of use
been taken into consideration?
15
Has the switch-off delay for stop category 1 been observed in the
calculation of the total response time for the machine/system?
No. Requirement (optional)
Yes
No
Comment
16
Have specifications for assembly and electrical installation been
defined (e.g., EPLAN) and communicated to the relevant personnel?
17
Have specifications for startup been defined and communicated to the
relevant personnel?
Date
Signature (editor)
Date
Signature (test engineer)
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from
Downloaded from