Battery Performance Test
12
Performance Verification
Battery Performance Test
The the A1 and A3 mono monitors are specified to typically operate on
battery power for a minimum of 4 hours, at 25°C, with no printing, and one
NiBP measurement every 15 minutes. The A3 color monitor is specified to
typically operate on battery power for a minimum of 3 hours, at 25°C, with no
printing, and one NiBP measurement every 15 minutes. Before performing
this test, ensure that the battery is fully charged (see “Battery Charge”).
1. Connect the Nellcor Puritan Bennett SRC-2 pulse oximeter tester to the monitor
via the M4787A sensor cable.
2. Connect the NiBP simulator to the monitor via the M3918A tubing.
3. Set the SRC-2 switches as follows:
4. Set the NiBP simulator to simulate a pressure setting of 120/80 mmHg and heart
rate of 80 bpm.
5. Ensure that the monitor is
not
connected to AC power.
6. With the monitor turned off, press the
ON/STANDBY
button
and verify
that the battery icon appears at the bottom of the display after the power-on self-
test is completed. The boxes in the battery icon should all be filled, indicating
that the battery is charged.
7. Verify that the monitor is responding to the SpO
2
simulator signal and that the
audible alarm is sounding. Use the wheel to select the SpO
2
Menu and
permanently silence the SpO
2
audible alarm.
8. Use the wheel to select the NiBP Menu and set the Automatic Measurement
Interval to 15 minutes. Exit the menu and press the front panel NiBP button
to manually start the first NiBP measurement. Subsequent NiBP
measurements are taken automatically every 15 minutes.
SWITCH
POSITION
RATE
38
LIGHT
LOW
MODULATION
LOW
RCAL/MODE
RCAL 63/LOCAL
Summary of Contents for M3921A
Page 12: ...xii Contents ...
Page 16: ...Related Documents 4 Introduction ...
Page 48: ...Safety Tests 36 Performance Verification ...
Page 72: ...Troubleshooting Guide 60 Chapter 5 Troubleshooting ...
Page 100: ...Disassembly Procedures A3 88 Chapter 6 Disassembly Guide ...
Page 103: ...Top Level Assembly Chapter 7 Spare Parts 91 Figure 2 A1 Top Level Assembly Drawing 2 of 2 ...
Page 105: ...Top Level Assembly Chapter 7 Spare Parts 93 Figure 3 A3 Top Level Assembly Drawing ...
Page 108: ...Front Case Assembly 96 Chapter 7 Spare Parts Figure 5 A1 Front Case Assembly Drawing 2 of 3 ...
Page 110: ...Front Case Assembly 98 Chapter 7 Spare Parts Figure 7 A3 Front Case Assembly Drawing 1 of 2 ...
Page 111: ...Front Case Assembly Chapter 7 Spare Parts 99 Figure 8 A3 Front Case Assembly Drawing 2 of 2 ...
Page 114: ...Rear Case Assembly 102 Chapter 7 Spare Parts Figure 9 A3 Rear Case Assembly Drawing 1 of 3 ...
Page 115: ...Rear Case Assembly Chapter 7 Spare Parts 103 Figure 10 A3 Rear Case Assembly Drawing 2 of 3 ...
Page 116: ...Rear Case Assembly 104 Chapter 7 Spare Parts Figure 11 A3 Rear Case Assembly Drawing 3 of 3 ...
Page 124: ...Repacking In A Different Carton 112 Chapter 8 Packing For Shipment ...
Page 144: ...Preventative Maintenance 132 Chapter 10 Training Program ...
Page 150: ......