![Philips Saeco Exprelia Series Service Manual Download Page 23](http://html1.mh-extra.com/html/philips-saeco/exprelia-series/exprelia-series_service-manual_1550645023.webp)
EXPRELIA 04 OPERATING LOGIC
Saeco International Group
Rev. 00 / June 2010
Page / 11
Notes: * Only with Pre-brewing
4.4.
Coffee
cycle
Switching on
When the machine is switched on, the gearmotor repositions itself as follows:
- It acts on microswitch 1 (see following chapter)
- The gearmotor changes its rotation direction and moves upwards again by approx. 1-2 mm
- The boiler begins to heat the water for approx. 45 sec., at full power, in order to reach the
optimal temperature. The temperature will then remain at a constant level.
Coffee cycle
The coffee grinder starts the grinding process (controlled by pulses generated by a sensor)
1.
The gearmotor (brewing unit) moves to the dispensing position
2.
Preliminary dispensing phase (short pump activity, short pause)
3.
Product dispensing (the pump operation period is de
fi
ned by the amount of product dispensed)
4.
The gearmotor moves to its home position (the dregs are expelled automatically)
5.
Main
switch ON
START
STOP
Time
Coffee grinder
Heating
Pump
Gearmotor:
Brewing unit
Status
Heating
Ready
Coffee cycle
Pulses
(Dosage)
Pump activity
(turbine pulses)
depending on the
product quantity
selected
approx.
45 sec.
*
05
OFF
Single microswitch gearmotor
ON
Status
Microswitch
Summary of Contents for Exprelia Series
Page 3: ...Saeco International Group Rev 00 June 2010 EXPRELIA CHAPTER 1 INTRODUCTION...
Page 8: ...Saeco International Group Rev 00 June 2010 EXPRELIA CHAPTER 2 TECHNICAL SPECIFICATIONS...
Page 18: ...Saeco International Group Rev 00 June 2010 EXPRELIA CHAPTER 4 OPERATING LOGIC...
Page 30: ...Saeco International Group Rev 00 June 2010 EXPRELIA CHAPTER 5 TROUBLESHOOTING...
Page 41: ...Saeco International Group Rev 00 June 2010 EXPRELIA CHAPTER 7 DISASSEMBLY...
Page 51: ...Saeco International Group Rev 00 June 2010 EXPRELIA CHAPTER 8 CHAPTER 8 NOTES NOTES...
Page 52: ...EXPRELIA 08 NOTES Saeco International Group Rev 00 June 2010 Page 01 01...
Page 54: ...EXPRELIA 09 WATER CIRCUIT DIAGRAM Saeco International Group Rev 00 June 2010 Page 01 01...
Page 56: ...EXPRELIA 10 WIRING DIAGRAM Saeco International Group Rev 00 June 2010 Page 01 01...