Power on the machine for setting of the charger
For setting instructions, please refer to Section 10.1–10.4 "Charger Standard
Setting instructions"
Power off and unplug the connection
Power off the machine and remove the network cable once setting is
completed (For those who are in a wired network environment, please go
straight to Step 10)
STEP 8
STEP 9
Push Start
Push Start
Green Power, Green Lifestyle.
26
Electric box
Electric box
Summary of Contents for AX Series
Page 2: ......