9
Installation
5
Installation
5.1 Setting up the pump
Installation location
When installing the pump, observe the following conditions:
• Note the load-bearing capacity of the mounting surface.
• Maximum installation altitude 1000 m (above mean sea level)
• Permissible ambient temperature: +12 ... 40°C
• Maximum relative humidity 95%
Fig. 4: Installation
Fill up with operating fluid before operating the first time
– Amount and type according to rating plate
Always place the pump on a firm, even surface.
– Where stationary installation is involved, anchor the pump on site.
When installing the pump in a closed housing, ensure there is sufficient air cir-
culation.
– Sightglass and gas ballast valve must be visible and readily accessible.
– Voltage and frequency information given on the motor rating plate must be
visible.
5.2 Connecting the vacuum side
Remove locking cap from the vacuum flange;
– pay attention to the cone strainer and the respective O-ring in the intake port.
The connection between the pump and the recipient should be kept as short as
possible.
max. 10
°
≥
35 mm
≥
5 mm
±
≥
5 mm
Summary of Contents for Penta 10
Page 31: ...31...