C
HEETAH
S
ERIES
S
WITCHERS
–
C
HAPTER
8
81-9059-0570-0
Rev. C
Proprietary Information of
PESA
S
WITCHING
S
YSTEMS
,
I
NC
.
101
8.5.2
Cheetah 512x512 and 1024x256 Chassis Mounting Procedure
The following steps should be performed to reduce the weight of the system thus making it slightly
easier to maneuver.
Retain these lag bolts because they will be needed to assemble the crate for
return shipment to PESA.
1.
Remove all the lag bolts from the top and sides of the wooden crate.
2.
Using ESD precautions, remove the PS600 power supplies from the top of the unit.
Prior to performing the next sequence, careful measurements should be
completed to insure the proper location and alignment of equipment rack’s
screw holes to the Cheetah chassis.
Additionally, since the ‘rack mounting installation bracket’ will ultimately
support the entire weight of the Cheetah chassis until the chassis rack screws
can be installed, it is important to insure that the front and rear section of this
‘rack mounting installation bracket’ are firmly screwed into the equipment
rack and secured.
3.
Align the ‘rack mounting installation bracket’ with the chassis and secure it into position near
the bottom of the equipment rack.
4.
Using a pallet jack or similar equipment, align and place the Cheetah chassis as close as
possible to the equipment rack opening to which it will be installed.
5.
If required, use the provided ‘forearm forklift’ straps and with ‘one’ person on each strap (4
people total), lift slightly and slide the chassis to transfer the weight of Cheetah chassis from the
wooden pallet to the ‘rack mounting installation bracket’ and then, slide the chassis into
position in the rack.
6.
Once the Cheetah chassis is inside the equipment rack, install ‘all’ of the rack screws in the
chassis so that the unit is firmly and adequately secured to the equipment rack.
7.
Remove the ‘rack mounting installation bracket’ from the equipment rack.
8.
Remove the ‘forearm forklift’ straps.
9.
Prepare the wooden crate, rack mounting installation bracket, and forearm forklift tools for
return shipment to PESA Switching Systems, Inc.
The install equipment has been sent to assist you in the installation of this
product. PESA Switching Systems, Inc. will pay the freight charges for the
return of this material along with the wooden crate. We would like to ask
that you make timely arrangements for the return of these items using
Emery/Menlo Worldwide and charging it to PESA Switching Systems, Inc.
freight-forwarding account number (to be assigned by PESA).
Summary of Contents for Cheetah 1024x256
Page 235: ......