background image

Assembly and Operation Manual  

8. Check serviceability and accuracy of all the electrical connections.  
9. Fasten all the cables in two points to the hole in the turnstile housing horizontal plane, 
using hook and loop cable ties.   
10. Connect the indication board cable header to the control mechanism connector and 
mount the cover with LED indication display

 

(2) back into its place in the reverse order. 

When the cover with LED indication display

 

(2) mounting is carried out correctly it does not 

need much effort. Fasten the cover with a bolt.  
11. Run a test switch on of the turnstile as specified in Chapter 9. 
12. Check operation of the intrusion detector and siren (if included in the delivery set) by 
the way described below. 
13. After the power-up wait until the moment of the test indicator (inside the intrusion 
detector) going off (from 10 to 50 sec), the turnstile should be in the “Always locked” mode 
(at the pulse control mode) or in the "Both directions closed" (at the potential control 
mode)). Put your hand before the intrusion detector. The continuous signal will sound 
when the intrusion detector activates. To eliminate that sound signal press any button on 
the RC panel. The sound will stop without pressing the button in 5±0.5 sec.  
14. Set the mounted barrier arm into the run position. The arm should be fixed 
automatically.  
15. Install the Ø30 plugs (14).  
16. Install Ø16 plug (included in the standard delivery set) into the hole for a screw 
fastening the turnstile cover, located on the housing. 
17. Once the installation has been completed, the turnstile is ready for operation. 

Table 1.  Connection layout description 

Legend 

Item 

Quantity 

Note 

А

1 Electromagnet 

 

1  

А

2

А

3

  Remote indicators  

RI A, RI B 

А

4

 

Remote indicator power supply  

 

А

5

 

Siren, 12V DC 

 

А

6

 

Turnstile power supply 

12V, 6

А

 

А

7 CLB 

1 CLB.140 

А

8 Indication 

module 

1  

А

9 Motor 

1  

А

10 

Optical arm rotation sensors 

 

А

11 RC 

panel 

1  H6/4 

А

12

 

Wireless remote control kit  

MSRF-4 

А

13

 

Access control system  

 

А

14

 

Emergency unblocking device (“Fire Alarm”) 

 

А

15

 

Intrusion detector  

CLIP-4 

1 Indication 

cable 

TTR-07.658.00 

1  

Wire jumper. Installed when the emergency unblocking 
device (

А

14) is not connected 

Installed on 
default 

Wire jumper. Installed when the intrusion detector (

А

15) 

is not connected 

Installed on 
default 

 

Supplied on request

   

20 

Summary of Contents for TTR-07.1

Page 1: ...ASSEMBLY AND OPERATION MANUAL TTR 07 1 Electromechanical Tripod Turnstile with Automatic Anti Panic Arms...

Page 2: ...Electromechanical Tripod Turnstile with Automatic Anti Panic Arms TTR 07 1 Assembly and Operation Manual...

Page 3: ...ency unblocking of the turnstile 15 5 11 Operation contingencies and response 15 6 MARKING AND PACKAGING 16 7 SAFETY REQUIREMENTS 16 7 1 Installation safety requirements 16 7 2 Operation safety requir...

Page 4: ...el WRC wireless remote control CLB control logic board 1 APPLICATION The TTR 07 1 electromechanical tripod turnstile with automatic anti panic folding arms hereinafter the turnstile is designed for ma...

Page 5: ...rotation force max 3 kgf RC panel cable length1 min 6 6 m Ingress Protection Rating IP41 under EN 60529 Electric shock protection class III IEC 61140 Mean time to failure min 4 000 000 passages Mean...

Page 6: ...adhesive cable tie mount 3 Technical documentation Certificate 1 Assembly and operation manual 1 Package Box 1 4 2 Optional equipment supplied on request WRC kit includes a receiver and transmitter t...

Page 7: ...on display 3 hub 4 hub fastening bolts 5 barrier arm 6 AC power cable 7 turnstile power supply 8 turnstile power cable 9 emergency unblocking device Fire Alarm 10 emergency unblocking device cable 11...

Page 8: ...current minimum 6 A in 5 sec 5 2 Design The design of the turnstile is shown in Fig 2 Numbers in brackets correspond to Fig 2 of this Manual 5 2 1 The turnstile comprises a turnstile housing 1 with s...

Page 9: ...dard e g the terminal is placed at the backside of the turnstile housing the RC panel orientation towards the turnstile can be changed by exchanging places of the RC wires to the contacts Unlock A and...

Page 10: ...be connected to the turnstile as follows any device separately in any combination with each other all devices simultaneously in parallel Note At the parallel connection of the above devices to the tur...

Page 11: ...es indication on the RC panel Led A Led Stop and Led B the signal of hub turning in the corresponding direction PASS and PASS the signal of the turnstile ready for a current command Ready the alarm ou...

Page 12: ...ntacts PASS A PASS B Ready and Detector are closed voltage is supplied to the relay coil and the Alarm relay contacts are broken voltage is not supplied to the relay coil The CLB relay operation relea...

Page 13: ...Appendix B The minimum input signal duration when the operating mode can be changed should be 100msec The passage waiting time is equal to the low level signal duration the turnstile remains open in...

Page 14: ...nel 5 7 3 The WRC operation manual is supplied with that device 5 8 Operation with an ACS controller 5 8 1 In the pulse control mode control over the turnstile with an ACS controller is similar to tha...

Page 15: ...n accordance with the connection layout Fig 4 and Fig 11 If the Fire Alarm input is not used it is necessary to set a jumper between the contacts Fire Alarm and GND This jumper is preset at the factor...

Page 16: ...further standard operation 5 11 Operation contingencies and response 5 11 1 The turnstile is capable of providing information on the following operation contingencies unauthorized access passage dela...

Page 17: ...uirements The installation should be carried out only by the qualified personnel after careful study of this Manual Warning All the cables should be connected up when the power supply is switched off...

Page 18: ...tion on less steady foundation frame foundation for example to mark the mounting holes according to Fig 10 to control the vertical position of the turnstile during installation to arrange additional e...

Page 19: ...rrent 6 A for compliance with Chapter 3 turnstile operating voltage 8 4 Installation procedure The following installation procedure complies with given installation recommendations see clause 8 1 1 Un...

Page 20: ...6 Install the hub 3 and the barrier arms 5 in the following order Insert the hub into a corresponding mounting face on the turnstile mechanism shaft Caution For proper hub installation before the fin...

Page 21: ...ntinuous signal will sound when the intrusion detector activates To eliminate that sound signal press any button on the RC panel The sound will stop without pressing the button in 5 0 5 sec 14 Set the...

Page 22: ...TTR 07 1 Electromechanical Tripod Turnstile Figure 11 Connection layout description is given in Table 1 21...

Page 23: ...arm should be fixed automatically 9 2 Operating modes of the turnstile in pulse control mode See Table 2 for the operating modes set from the RC PANEL and for the corresponding indication Please note...

Page 24: ...ked in the direction of completed passage 4 Free passage in the set direction open for free passage in the chosen direction Press the STOP button and the button corresponding to the chosen passage dir...

Page 25: ...ntact corresponding to the set passage direction the turnstile remains open in the set direction 3 Both passage directions are open the turnstile is open for passage in both directions The low levels...

Page 26: ...e the outer panel Check the power cable serviceability and reliability of its connection to the CLB XT3 connector block The turnstile is not controlled in one of the directions and there is light indi...

Page 27: ...ation axis Note Avoid the ingress of lubricant on the arm rotation sensor disc and the roller surfaces 5 Check the reliability of the cable connections to the CLB connector blocks ling When the cover...

Page 28: ...amper holder 21 optical arm rotation sensor 11 TRANSPORTATION AND STORAGE The turnstile in the original package should be transported in closed freight containers or in other closed type cargo transpo...

Page 29: ...the passage direction B opens either for 5 sec or until the passage has been effected in this direction or until the command Always locked and the status of the passage direction A does not change The...

Page 30: ...at the contact Unlock A while there is a low level at the contacts Unlock B and Stop or active front is at the contact Unlock B while there is a low level at the contacts Unlock A and Stop or active f...

Page 31: ...open for passage in the direction There is a low level at the contact Unlock while there is a high level at the contacts Stop and Unlock At this command the direction B opens till the low level signal...

Page 32: ......

Page 33: ...PERCo Polytechnicheskaya str 4 block 2 194021 Saint Petersburg Russia Tel 7 812 247 04 64 E mail export perco com support perco com www perco com...

Page 34: ...www perco com...

Reviews: