
2
0
2
0
-0
4
42
VisuNet GXP
Mechanical Installation
7.
Route the cable through the cable gland on the TCU/PCU. Install the wire ends per the tables
below.
Wiring Guide
DATL-IDM-DB-S-XX00-N0 to IDM-Z1-160* and Base Station IDM-Z1-x61-B-N0* Ex i
DATL-IDM-DB-S-XX00-N0 to IDM-Z1-260*
TCU
Cable
Terminal
Signal
Name
Direction
Assignment
Color coding
Pin M12 con-
nector
Xx.1
Vcc
Supply
Vcc
green
1
Xx.2
GND
Supply
GND
brown
3
Xx.3
-
-
-
-
-
Xx.4
-
-
-
-
-
Xx.5
-
-
-
-
-
Xx.6
RxD
I
TxD
white
4
Xx.7
-
-
-
-
-
Xx.8
-
-
-
-
-
TCU
Cable
Terminal
Signal
Name
Direction
Assignment
Color coding
Pin M12 con-
nector
Xx.1
Us
Supply
Vcc
green
1
Xx.2
RxD
I
TxD
white
4
Xx.3
-
-
-
-
-
Xx.4
-
-
-
-
-
Xx.5
GND
Supply
GND
brown
3
Xx.6
-
-
-
-
-
Xx.7
-
-
-
-
-
Xx.8
-
-
-
-
-
Note
For detailed information on electrical installation, refer to the TCU/PCU and IDM* barcode
reader manuals.