
VisuNet GXP
Mechanical Installation
2
0
2
0
-0
4
23
5.
Pull the cable through the cable entry and out the top of the pedestal.
6.
Pull the cable through the pedestal so that 50 cm of cable is hanging out of the top of the
pedestal.
7.
Repeat the preceding steps for each cable that must be routed through the pedestal.