 7000XTR  Service Manual 

• 

5

TIMER OPERATION

Figure 2  

Valve State

INI (Initializing) 

INI will display on the screen for 30 to 45 seconds when 

initializing after a power failure reset or programming.

RGQ (Regeneration Queued)

RGQ indicates that the reserve has been entered in a delayed 

system and regeneration has been queued. When in the main 

screen, press the Shift button to toggle service (SRV) with RGQ.

Service (SRV)

SRV will display when the unit is in service.

LED Status Lights

Blue LED

Illuminates while the unit is in service and no errors exist. The 

unit will always be in service unless a regeneration trigger has 

occurred (green LED light will be displayed). 

Green LED

Illuminates when the unit is in Regeneration mode, unless an 

error condition exists.

Red LED

Illuminates when there is an error.

Flow Indicator

A rotating line (appearing as a rotating star shape) will display 

on the screen when flow is going through the the meter.

Regeneration

•  A time initiated control valve regenerates when the 

number of programmed days has been reached

•  A flow initiated control valve regenerates when the 

volume count is zero or is below reserve capacity

System Type

Regeneration Trigger

Time Clock Delayed

A) Day override parameter is reached and 

B) the time of day matches the regeneration 

day override time

Meter Immediate

Regenerates as soon as the volume 

remaining has been depleted

Meter Delayed Fixed 

Reserve

A) Volume remaining has been depleted 

to the fixed reserve volume and B) the 

regeneration time has been reached

Meter Delayed 

Variable Reserve

A) Volume remaining has been depleted 

to the variable reserve volume and B) the 

regeneration time has been reached

Meter Delayed 

Weekly Reserve

A) Volume remaining has been depleted to 

the weekly variable reserve volume and B) 

the regeneration time has been reached

Volume Override 

Immediate

As soon as the programmed volume 

remaining has been depleted from the tank

Volume Override 

Delayed

As soon as soon as the programmed volume 

remaining has been depleted from the tank 

and the regeneration time has been reached

Setting the Time of Day

1.  Press and hold the Up or Down button for 2 seconds. 
2.  Press the Shift button to select the digit you want to modify.
3.  Press the Up or Down buttons to adjust the value.
4.  Press the Extra Cycle button to return to the normal 

display screen, or after a 5 second timeout.

NOTE:   The “D” button (Diagnostic) can be pressed to exit 

without saving.

Manually Initiating a Regeneration

1.  When timer is in service, press the Extra Cycle button for 5 

seconds on the main screen.

2.  The timer advances to Regeneration Cycle Step #1, and 

begins programmed time count down.

3.  Press the Extra Cycle button once to advance valve to 

Regeneration Cycle Step #2 (if active).

4.  Press the Extra Cycle button once to advance valve to 

Regeneration Cycle Step #3 (if active).

5.  Press the Extra Cycle button once to advance valve to 

Regeneration Cycle Step #4 (if active).

6.  Press the Extra Cycle button once to advance valve to 

Regeneration Cycle Step #5 (if active).

7.  Press the Extra Cycle button once to advance valve to 

Regeneration Cycle Step #6 (if active).

8.  Press the Extra Cycle button once more to advance the 

valve back to in service.

NOTE:   A queued regeneration can be initiated by 

pressing the Extra Cycle button. To clear a queued 

regeneration, press the Extra Cycle button again 

to cancel. If regeneration occurs for any reason 

prior to the delayed regeneration time, the manual 

regeneration request shall be cleared.

Summary of Contents for FLECK 7000XTR

Page 1: ...www pentairaqua com FLECK 7000XTR SERVICE MANUAL...

Page 2: ...be installed by a plumbing professional This unit is designed to be installed on potable water systems only This product must be installed in compliance with all state and municipal plumbing and elect...

Page 3: ...ss __________Grains French Degrees German Degrees PPM 7 Capacity Safety Factor A Zero B __________ 8 Volume Override __________ Gallons or M3 9 Regeneration Day Override A Off B Every__________Days 10...

Page 4: ...to local plumbing codes 3 Cut the 1 05 inch 2 6 cm distributor tube flush with the top of the tank A Deburr the outside of the tube B after cutting Lubricate the o ring C with non petroleum based grea...

Page 5: ...eration time has been reached Meter Delayed Weekly Reserve A Volume remaining has been depleted to the weekly variable reserve volume and B the regeneration time has been reached Volume Override Immed...

Page 6: ...ay Regeneration Day Override Feature If the Day Override option is turned on and the valve reaches the set Regeneration Day Override value the Regeneration Cycle starts at the programmed regeneration...

Page 7: ...FLECK 7000XTR Service Manual 7 MASTER PROGRAMMING MODE FLOW CHART CONTINUED...

Page 8: ...tra Cycle button 2 Valve Type This program step selects the valve type Press the Up or Down buttons to adjust this value Press the Extra Cycle button 3 Regenerant Flow This program step selects how th...

Page 9: ...y Output Window Start End Time Setting This option setting consists of two displays The first display sets the turn on time of the output referenced to the start of the first regeneration cycle The se...

Page 10: ...types 3 Set Regeneration Day Override To turn on and set the days press the Down button Press the Shift Up and Down buttons to move the cursor and change the value of the numbers Press the Extra Cycl...

Page 11: ...the Extra Cycle button 2 Peak Flow Rate This program step displays the peak flow rate 1 minute average since the last regeneration Press the Extra Cycle button 3 Totalizer This program step displays t...

Page 12: ...ar Main 7 1 40704 Cam Brine Downflow 8 1 40979 Plate Lower Support 9 1 61635 01 Cover Assy 7000 II Black 1 61634 01 Cover Assy 7000 II Gray 10 1 40980 Backplate 7000 11 4 13602 Screw Phil Rd Hd 6 32 x...

Page 13: ...FLECK 7000XTR Service Manual 13 CONTROL VALVE ASSEMBLY 61500 7000EXP REV C...

Page 14: ...C Assemblies DLFC Size GPM 61455 00 3 4 inch Blank 61455 17 3 4 inch 1 7 61455 20 3 4 inch 2 0 61455 24 3 4 inch 2 4 61455 30 3 4 inch 3 0 61455 35 3 4 inch 3 5 61455 40 3 4 inch 4 0 61455 45 3 4 inch...

Page 15: ...ch BSP w O ring 3 2 41242 01 Connector Assy 1 inch 1 4 inch Sweat w O ring 41243 01 Connector Assy 1 1 4 inch 1 1 2 inch Sweat w O ring 4 2 40576 Clip H Plastic 7000 5 1 40951 O ring 220 Not Shown 1 6...

Page 16: ...LECK 7000XTR Service Manual 2310 SAFETY BRINE VALVE Item No QTY Part No Description 1 1 60014 Safety Brine Valve Assy 2310 2 1 60068 30 Float Assy 2310 w 30 inch Rod 3 1 60002 34 Air Check 500 42112 R...

Page 17: ...Flashing blinking display Power outage has occurred Either wait 5 minutes for blinking to stop or press any key on the keypad Unit not responding after going into regeneration Verify the unit is confi...

Page 18: ...system Remove piston and clean control Loss of mineral through drain line Air in water system Assure that well system has proper air eliminator control Check for dry well condition Improperly sized dr...

Page 19: ...ts and reset reserve capacity to provide additional reserve Meter is not measuring flow On Mechanical Meter Check with meter checker kit If volume is not registering check the meter cap and impeller f...

Page 20: ...REV A 41121 REV A Backwash Position 40988 REV A 41121 REV A Brine Position 40988 REV A 41121 REV A Slow Rinse Position 40988 REV A 41121 REV A Second Backwash Position 40988 REV A 41121 REV A Rapid R...

Page 21: ...t board align notches on left side of board with flexible finger on power head Apply pressure to left while rotating the board back 42554 REV A 2 When all the way down snap the circuit board into plac...

Page 22: ...22 FLECK 7000XTR Service Manual DIMENSIONAL DRAWINGS 61500 7000XTR LNE REV A METER FLOW DATA TR18753 Softener TR18688 Filter 41140 02 REV A...

Page 23: ...FLECK 7000XTR Service Manual 23 INJECTOR FLOW DATA TR18755 REV B...

Page 24: ...emarks and logos are the property of their respective owners Because we are continuously improving our products and services Pentair reserves the right to change specifications without prior notice Pe...

Reviews: