background image

13 

                                                                                                                     

Note: Refer to page 3 where (parts index number) is shown  

 

EasyTouch/IntelliTouch Control System Upgrade Kits Installation Guide

NOTES

Summary of Contents for EasyTouch

Page 1: ...LLICENTER CONTROL SYSTEM For Systems 2012 or Newer IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS INSTALLATION GUIDE Pool Spa Features Lights Air Temp 65 F Schedule Usage Chemistry Status 3 3 8 00 A M 6 50 0 4 84 78 ...

Page 2: ...y conduit junction boxes or enclosures containing other conductors unless such conductors are also protected by a ground fault circuit interrupter Refer to local codes for details 4 A terminal bar stamped is located inside the supply terminal box To reduce the risk of electric shock this terminal must be connected to the grounding means provided in the electric supply service panel with a continuo...

Page 3: ...ol applications only Most states and local codes regulate the construction installation and operation of public pools and spas and the construction of residential pools and spas It is important to comply with these codes many of which directly regulate the installation and use of this product Consult your local building and health codes for more information This guide provides installation and ope...

Page 4: ...r than single family dwellings a clearly labeled emergency switch shall be provided as part of the installation The switch shall be readily accessible to the occupants and shall be installed at least five 5 feet 1 52 m away adjacent to and within sight of the unit Except for listed spa side remote controls install a minimum of five 5 feet 1 52 m from the inside wall of the pool and spa For informa...

Page 5: ...nterference in a residential installation The IntelliCenter Control System generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instructions may cause harmful interference to radio communications However there is no guarantee that interference will not occur in a particular installation If this device does cause harmful interference to radio or...

Page 6: ...lified pool technician Do not permit children to use this product Pentair Water Pool and Spa IMPORTANT SAFETY INSTRUCTIONS For Installation of Electrical Controls at Equipment Pad ON OFF Switches Timers and Automation Control Systems Install all electrical controls at equipment pad such as on off switches timers and control systems etc to allow the operation start up shut down or servicing of any ...

Page 7: ...stems Systems using the following Load Center or Power Center use the following kit part numbers 2012 or newer square low voltage circuit breaker configuration P N 522047 for i10P P N 522048 for i10PS P N 523049 for i10D System must be marked as UL listed certified EasyTouch and IntelliTouch Control System Upgrade Installation Kits IntelliCenter Control System Outdoor Control Panel Pool Spa Featur...

Page 8: ...STALLING THE WIRING LABEL ON THE ENCLOSURE FRONT DOOR 11 Note INSTALLING THE WIRELESS ANTENNA KIT See IntelliCenter Control System Installation Guide CAUTION If there are EasyTouch or IntelliTouch Control System installed accessories such as an Indoor Control Panel or Wireless Remote they will no longer function after installing the IntelliCenter Control System Upgrade Kit In addition to the free ...

Page 9: ... N 522475 Wireless Antenna Kit 9 P N 522612 Wiring Label IntelliCenter Control System IntelliCenter Control System manuals not shown Installation Guide P N 522989 User s Guide P N 522990 Quick Reference Guide P N 522988 Wi Fi Remote Installation Guide P N 523350 BOX CONTENTS Kit P N 522047 522048 523049 P N 522102 System Transformer P N 522337 Circuit Breaker Label P N 521090 Circuit Breaker Plug ...

Page 10: ...E SYSTEM COMPONENTS 2 Unlatch the front door latch Open the door of the Load Center or Power Center 3 Remove the two screws securing the High Voltage Cover Panel Remove the panel and set aside 4 Loosen the two retaining screws securing the existing control panel Fold down the panel to access the circuit board low voltage connections and transformer connector Continue to next page WARNING RISK OF E...

Page 11: ... connector and if necessary the SCG Board connector RS 485 from the existing Outdoor Control Panel circuit board 6 Disconnect all other connections from the circuit board Figure 3 Transformer Connector and SCG Board Connector 7 Remove the two screws securing the outdoor control panel bezel Remove the outdoor control panel and bezel from the enclosure See Figure 2 on page 4 Transformer Connector SC...

Page 12: ...edle nose pliers press the side tabs and slide the circuit breaker out of the front of the bracket Remove the circuit breakers from the bracket Install the IntelliCenter Control System 5AMP P N 522339 and 4 AMP P N 522338 circuit breakers See Figure 5 on page 7 4 Insert the 5A circuit breaker 3b into the front of the bracket first opening on the left side front view and snap in place Be sure to or...

Page 13: ...enclosure Discard the existing system transformer 2 Wiring the Low Voltage Transformer Mount the new transformer 6 P N 522102 onto the back wall of the enclosure Secure it with the four screws 7 P N 520222 provided in kit See Figure 6 Route the transformer and Circuit breakers secondary wires through channel opening up to the circuit breaker bracket 3 Connect Circuit Breaker Wires Connect both Ora...

Page 14: ...ormer Load Center or Power Center 2012 or later Route transformer secondary wires up through channel opening to circuit breakers 4 Reconnect 120 VAC Transformer Wires Reconnect the System Transformer wires see wiring diagram below to the Load Center or Power Center circuit breaker INPUT INPUT BREAKER SUBPANEL BONDING LUG Circuit Breakers IntelliCenter Control System 120VAC and 240VAC Transformer W...

Page 15: ...ne Generator SCG SCG Ground Wire 5 Install the circuit breaker bracket with the circuit breakers onto the enclosure and secure it with two 8 32 x 3 8 screws 7 6 Secure the circuit breaker bracket onto the back of the enclosure with 8 32 x 3 8 screw Be sure to reinstall the SCG ground wire if present See Figure 7 Bracket Screw Bracket Screw Bracket Screw 12 Figure 8 Circuit Breaker Bracket Screws F...

Page 16: ...alling the IntelliCenter Control System Outdoor Control Panel Figure 10 IntelliCenter Control System Outdoor Control Panel Retaining screw Retaining screw Bezel screw Bezel screw Please refer to the IntelliCenter Control System Installation Guide P N 522989 and the IntelliCenter Control System User s Guide 522990 for the following information Connecting the system transformer and SCG transformer o...

Page 17: ...r Control System Upgrade Kit Figure 11 IntelliCenter Control System Circuit Board with optional Expansion Boards shown 1 Remove the backing from the wiring label 2 Affix the wiring label 10 P N 522612 onto High Voltage Cover panel See Figure 12 3 Close the front door and secure with the latch 4 Switch ON AC POWER to the load center at the circuit breaker Place label onto High Voltage Cover panel A...

Page 18: ...12 Note Refer to page 3 where parts index number is shown EasyTouch IntelliTouch Control System Upgrade Kits Installation Guide NOTES ...

Page 19: ...13 Note Refer to page 3 where parts index number is shown EasyTouch IntelliTouch Control System Upgrade Kits Installation Guide NOTES ...

Page 20: ...filiates IntelliCenter EasyTouch IntelliTouch IntelliChlor are trademarks and or registered trademarks of Pentair Water Pool and Spa Inc and or its affiliated companies in the United States and or other countries Because we are continuously improving our products and services Pentair reserves the right to change specifications without prior notice Pentair is an equal opportunity employer 2019 Pent...

Reviews: