background image

 

 

 

Page 9 of 10

 

 

 

 

 

NOTE

 

 

 

Minor  dings or scratches on hard anodized 

aluminium  surfaces  may be temporarily 

protected with  epoxy paint. However, since 

catastrophic failure can result if corrosion 

occurs,  damaged parts  should be replaced 

with new ones as soon as possible.

 

 

 

 

Head Assembly  (Contd...)

 

 

 

 

4.   Hold Bearing Plate with the 3 

½

” diameter stepped 

surface facing towards you. From this side, insert the 
smaller machined end of the stainless steel Feed/ 
Concentrate Port through the larger outer hole.

 

5.   Holding the port in place, install the Port Retainer 

set into the groove in the machined end of the port. 
Pull port back until retaining ring set bottoms in

 

the Bearing Plate recess.

 

 

 

 

 

 

 

 

 

 

 

 

Installing of F/C Port  & Port Retainer set

 

Installing  Permeate Port into the Sealing plate

 

8.    Snap  the  Retaining  ring  into  the  groove  in  the 

Permeate Port, up  against the  face of  the  Bearing 
Plate.

 

9.   Examine the assembly to ensure that the mating faces

 

of the Sealing and Bearing Plate are in complete contact. 
If they are not, dis-sassemble the head and start over.

 

 

 

NOTE

 

 

The 1/8” blind hole in one surface of the 
Sealing Plate must be on the side facing 

away from the Bearing Plate.

 

 

6.   Holding  the  Bearing  Plate  and  Feed/Concentrate 

Port firmly together, press the Sealing Plate on to the 
machined  end  of  the  Feed/Concentrate  Port  so  that 
the two pairs of holes line up.

 

7.   Assemble the Permeate Port through the center hole 

in the Sealing Plate, align the Permeate port pin with 
the Sealing Plate alignment hole and press fully into 
position.

 

 

 

Installing  the Bearing Plate and Sealing Plate

 

10. When head is correctly assembled, insert the Plug 

Seal O-ring into the groove on the outside diameter 
of the Seal Plate.

 

 

11. Protect heads from contamination until ready to 

assemble into the vessel(s).

 

 

Refurbishing Parts

 

Plastic parts: examine for cracking, softening or discoloring. 
This may indicate chemical attack of the material. Defective 
parts must be replaced. Alternate materials may be required. 
Contact your supplier or Pentair Water for assistance

 

Metal parts: check for corrosion, scratches, dents, cracks or 
other damage to insert ring and spiral retaining ring.

 

Carefully inspect each component for any damage that 
could affect structural strength or sealing properties. The 
following examples show some of the situations in which 
parts should be replaced.

 

Bearing  Plate - hard-anodized surface removed at any 
point or corroded

 

Sealing  Plate - cracked, softened or distorted

 

Feed/Concentrate Port - bent or distorted

 

Permeate Port - cracked, softened or thread damaged 
Retaining  Ring  - chipped, scratched, corroded or bent 
Port Retainer  - bent or damaged

 

 

Distributed by Applied Membranes, Inc. | www.appliedmembranes.com |  (760) 727-3711 |  USA

Summary of Contents for 40E100 RO

Page 1: ...may result in catastrophic failure pressurize vessel until after visually inspecting to ensure that the spiral retaining ring is correctly installed tolerate leaks or allow end closures to be routinel...

Page 2: ...nternally wound in place Shell exterior coated with white high gloss polyurethane paint Head 2 2 47471 Bearing Plate 6061 T6 hard anodiz ed Alum Alloy 3 2 50481 Seal Plate PVC Thermoplastic gray 120 F...

Page 3: ...ng ring Use the smaller hole Hold the tool flat against the end margin and parallel to the vessel bore It is then possible to pull the end of the retaining ring straight out The retaining ring may sna...

Page 4: ...3 Once the retaining ring has been removed examine the area for burrs or dings which could damage the head or membrane If necessary use ScotchBriteTM or 600 grade sandpaper to smooth the area Removin...

Page 5: ...nd upstream end is the end plumbed most directly to the pump 2 Push element s out of vessel from the upstream end 3 For multi element vessels remove the intercon nectors and retain for reinstallation...

Page 6: ...ons to the vessel and all around the vessel itself If any leaks occur release pressure from the vessel and tighten the fittings as necessary Then pressurize vessel and check for leaks again 8 Insert e...

Page 7: ...Plug Seal 2 Remove circlip from its groove in the Permeate port Take care not to scratch the hard anodized surface of the bearing plate Separate the Sealing plate and the Bearing plate 5 Push Feed Co...

Page 8: ...Use only head components in as new condition Use new O rings each time the head is assembled 2 Cover O rings with a this even layer of Parker Super O LubeTM silicon lubricant or the lubricant recomm e...

Page 9: ...to the machined end of the Feed Concentrate Port so that the two pairs of holes line up 7 Assemble the Permeate Port through the center hole in the Sealing Plate align the Permeate port pin with the S...

Page 10: ...etal parts using a wire brush 2 Scrub the entire surface with medium grade Scotch BriteTM until all contaminants are removed 3 Rinse parts clean with fresh water and dry 4 Inspect all parts for servic...

Reviews: