background image

 

7

 

IntelliFlo

® 

Pump Demo Kiosk Operation and Set-Up Instructions 

IntelliFlo

® 

Pump Demo Kiosk Operation and Set-Up Instructions 

120V/240V A/C Step-Up Transformer 

The kiosk transformer should be the only equipment connected to the outside of the kiosk. It should connect to a 20 
amp circuit.

1.  Be sure the voltage “tap-plug” selector to the 110V on the back of the transformer voltage is in the 110V position. 
2.  The external power cord may be routed through the 2” diameter opening located in the back wall of the cabinet. 
3.  The transformer “Power On” switch should be facing the front of the cabinet. Plug A/C power strip into the left-

hand side 110V socket of the Step-Up Transformer.

4.  Plug the 12 gauge power cord into the 220V socket Plug the other end into the DAQ-202 “black box”; at the “line 

in” socket (be sure the on/off switch on the DAQ-202 is in the OFF position). 

Voltage Input 
Selector must 
be in 110V

Transformer

“Black Box”

A/C outlet plugs 
into the 110V 
side of the 
transformer

Summary of Contents for DAQ-202

Page 1: ...IntelliFlo Pump Demo Kiosk Operation and Set Up Instructions Pre Installed Live Pump Demo...

Page 2: ...nt is subject to change without notice IntelliFlo and Pentair Water Pool and Spa are trademarks and or registered trademarks of Pentair Water Pool and Spa Inc and or its affiliated companies in the Un...

Page 3: ...s Shipping Contents Quick Reference Guide Connection Diagram Cabinet Set Up Front Handle Installation Base Cabinet and Pump Module Assembly Connecting Pump to Power Supply Installing the Piping Gray P...

Page 4: ...ischarge Lo Pressure TDH pump suction LEGEND LO HI ON OFF FLOW PRESSURE Step Up Transformer 120V 240V Laptop 19 LCD Monitor Power Up Sequence 1 Main 120V Supply ON 2 Transformer ON 3 Black Box On 4 Mo...

Page 5: ...sembly includes IntelliFlo pump Threaded union adapters attached to pump Pump mounted on mounting board LCD monitor stand Power cord Front Handle Assembly Using a Philips head screw driver attach the...

Page 6: ...low Assembly into the clear pipe end of the assembly 3 Start by placing the tasselled end into the opening and continue by pushing into the pipe until the metal ring is flush out inside the gasket see...

Page 7: ...Slide the water tub lid and pipes into the open area on the left side of the kiosk cabinet with the 1 1 2 suction pipe section facing toward the front Installing White PVC Piping Inside Cabinet Flexi...

Page 8: ...EGEND LO HI ON OFF FLOW PRESSURE Step Up Transformer 120V 240V Laptop 19 LCD Monitor Power Up Sequence 1 Main 120V Supply ON 2 Transformer ON 3 Black Box On 4 Monitor ON 5 Laptop ON Critical Step Moni...

Page 9: ...ower cord may be routed through the 2 diameter opening located in the back wall of the cabinet 3 The transformer Power On switch should be facing the front of the cabinet Plug A C power strip into the...

Page 10: ...et on the upper right shelf Do not turn on the computer Follow the start up sequence on page 16 Setting up the Wireless Mouse 1 Be sure to plug in USB adapter for wireless mouse The adapter may be loc...

Page 11: ...pump board 3 Connect to the pump by pushing the quick release metal tabs on the connectors at the pump when installing the tube ends 4 RED end goes to the HIGH pressure connector discharge BLUE goes t...

Page 12: ...are found press the Stop Start button on the pump keypad tighten loose connections and resume start up 5 Turn the monitor ON Note Turn on monitor before turning on the computer 6 Turn the wireless mou...

Page 13: ...First uninstall the current version to be sure you have latest software update 1 Click the Start menu lower right corner of tool bar and click Control Panel 2 Select Programs and Features 3 Select Pen...

Page 14: ...the energy savings for a Standard vs IntelliFlo Variable Speed pump using the default values 4 To input your savings scenario click Click Here to Change Pool Description and follow the on screen instr...

Page 15: ...on the selected pool size 6 To exit this screen and return to the 3 Meters Screen right click on the upper left corner of the screen 7 From the 3 Meter Screen there is also an informational video on t...

Page 16: ...on set to 1440 x 900 resolution To switch between Calculator and pool size selection screen press Alt and Shift at the same time Demo kiosk shipments may include a flash drive with the latest software...

Reviews: