
45
6. Operation
6.1. Preliminary Note
1. Check the batteries by turning to any position. If the batteries
are weak,
a
sign will appear on the left of display. If
this does not appear
on the display proceed as below.
See "Maintenance" if the batteries
have to be replaced.
Please use only 4mm-safety test leads to ensure immaculate
functions.
2. The warning sign next to the test leads jack is for warning that
the input voltage or current should not exceed the indicated
values. This is to prevent damage to the internal circuitry.
3. The function switch should be set to the range which you want
to test before operation.
6.2. DC Voltage Measurement
1. Connect the black test lead to the COM jack and the red test
lead to the
V/
Ω - jack.
2. Set the Function switch to mV
or V
3.
Select DC by pressing the “SELECT” button.
4. Connect the test leads across the source or load under
measurement.