![background image](http://html1.mh-extra.com/html/patton-electronics/iplink-3210-series/iplink-3210-series_getting-started-manual_4070846113.webp)
Introduction
113
IPLink 3210 Series Getting Started Guide
F • Installation checklist
Introduction
This appendix lists the tasks for installing an IPLink 3210 Series G.SHDSL VPN Router (see
table 20
). Make
a copy of this checklist and mark the entries as you complete each task. For each IPLink 3210 Series Router,
include a copy of the completed checklist in your site log.
Table 20. Installation checklist
Task
Verified by
Date
Network information available & recorded in site log
Environmental specifications verified
Site power voltages verified
Installation site pre-power check completed
Required tools available
Additional equipment available
All printed documents available
IPLink release & build number verified
Rack, desktop, or wall mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Cable length limits verified
Initial configuration performed
Initial operation verified
Summary of Contents for IPLink 3210 Series
Page 4: ...Summary Table of Contents IPLink 3210 Series Getting Started Guide 4...
Page 10: ...Table of Contents IPLink 3210 Series Getting Started Guide 10...
Page 18: ...About this guide IPLink 3210 Series Getting Started Guide 18...
Page 90: ...90 Chapter 8 LEDs status and monitoring Chapter contents Status LEDs 91...
Page 110: ...110 Appendix E IPLink 3210 Series factory configuration Chapter contents Introduction 111...
Page 112: ...112 Appendix F Installation checklist Chapter contents Introduction 113...