If the air inlet and/or exhaust vent terminal are through
the sidewall, clearances from other exhaust/inlet,
windows, doors, building openings, snow line, etc
must be  as shown in the figure above.

There must be either 5' vertical separation or 10'
horizontal separation between the flue gas outlet and
the combustion air inlet.

The bottom of the flue gas outlet must be located at
least 12 inches above finish grade or snow line, but
must be at least 7 feet above finish grade when located
adjacent to a public walkway.  It must also have a
minimum clearance of 4 feet horizontally from, and in
no case above or below, (unless a 4 foot horizontal
distance is maintained,) electric meters, gas meters,
regulators and relief equipment.

3.4.2  Rooftop Installations

4' min.

above
snow line

10' min.

4' min.

Flue Gas
Outlet

Combustion 
Air Inlet

Combustion

Air Inlet

Vent

4' min.

above

snow line

10' min.

4' min.

Flue Gas

Outlet

Clearances which must be maintained when both inlet
and exhaust are through the roof are shown in the
figures above.

3.4.3  Minimum Clearance for Boiler
Connections

There are special considerations needed when
installing the air inlet and exhaust duct systems
because of the orientation of these connections on the
boilers.

3.4.3.1  Series 700, 1000, 1200

Air Inlet

Round

Damper

26" Min.

*

90  Elbow

o

*  Dimension shown above is based on 12" round
ductwork.

A minimum clearance of 26 inches is required on the
left side of the boiler to permit the connection of the
air inlet duct to the boiler.

Summary of Contents for DVSCM-02

Page 1: ...KELLEY THERMIFIC DIRECT VENT SEALED COMBUSTION GAS FIRED BOILER Supplement to the standard Installation and Owner s Manual TBIG Latest Edition Installation Date _______________________ 100 Burson Stre...

Page 2: ...Hi Lo 15 6 1c Lo Hi Lo IRI 17 6 1d On Off Series 1500 1700 2000 19 6 1e On Off IRI Series 1500 1700 2000 21 6 2 Auxiliary Control Panel 23 6 2 1 On Off Auxiliary Control Panel 23 Reorder No 6020 V2WH...

Page 3: ...dard B vent is not approved Proper vent sizing by the vent manufacturer s recommendation must be followed The exhaust vent may be run horizontally or vertically The maximum allowable length of the exh...

Page 4: ...stallation and Owner s Manual TBIG Both documents must be used together This companion document describes those safety installation adjustment and maintenance procedures which differ from the standard...

Page 5: ...all Galvanized Duct Proper sealing of the tubing is necessary to prevent flow of combustion air from conditioned space If single wall galvanized tubing is used GE RTV 102 silicone sealant or equivalen...

Page 6: ...et on Series 1500 1700 and 2000 A separate box of accessories is sent with the boiler 1 Attach the 6 inch diameter end of the custom transition duct and the extension to the collar using a minimum of...

Page 7: ...the boiler when wiring There are also five 5 field run wires between the auxiliary control panel and the inlet damper assembly three 3 to the damper actuator and two 2 to the limit switch 1 Terminals...

Page 8: ...135 tee must be installed not a standard tee If the flue gas exhaust is to be routed through the sidewall a minimum vertical rise of 6 feet is required from the outlet of the boot tee 135 tee to the i...

Page 9: ...referred method to terminate the exhaust vent is with a rain cap to minimize the drippage of condensate onto the roof and ice build up The rain cap should be an unrestrictive type similar to the figur...

Page 10: ...a 4 foot horizontal distance is maintained electric meters gas meters regulators and relief equipment 3 4 2 Rooftop Installations 4 min above snow line 10 min 4 min Flue Gas Outlet Combustion Air Inle...

Page 11: ...indicator will remain on until sufficient air flow is sensed If the air flow switch is not closed in 120 seconds the time delay relay will open its normally closed contacts This will turn off the blo...

Page 12: ...0 7 8 6 9 7 8 6 8 7 9 6 7 8 6 6 8 6 5 8 1 6 4 8 1 6 3 8 2 6 2 8 2 6 1 8 3 6 8 3 Important measure combustion air temperature at the unit do not assume the combustion air temperature is the same as the...

Page 13: ...Thermific Gas Fired Boiler Wiring Diagrams Page 11 6 0 WIRING DIAGRAMS 6 1 ON OFF SERIES 700 1000 1200 Wiring Diagram...

Page 14: ...Thermific Gas Fired Boiler Wiring Diagrams Page 12 6 1 ON OFF SERIES 700 1000 1200 Logic Diagram...

Page 15: ...Thermific Gas Fired Boiler Wiring Diagrams Page 13 6 1A ON OFF IRI SERIES 700 1000 1200 Wiring Diagram...

Page 16: ...Thermific Gas Fired Boiler Wiring Diagrams Page 14 6 1A ON OFF IRI SERIES 700 1000 1200 Logic Diagram...

Page 17: ...Thermific Gas Fired Boiler Wiring Diagrams Page 15 6 1B LO HI LO Wiring Diagram...

Page 18: ...Thermific Gas Fired Boiler Wiring Diagrams Page 16 6 1B LO HI LO Logic Diagram...

Page 19: ...Thermific Gas Fired Boiler Wiring Diagrams Page 17 6 1C LO HI LO IRI Wiring Diagram...

Page 20: ...Thermific Gas Fired Boiler Wiring Diagrams Page 18 6 1C LO HI LO IRI Logic Diagram...

Page 21: ...Thermific Gas Fired Boiler Wiring Diagrams Page 19 6 1D ON OFF SERIES 1500 1700 2000 Wiring Diagram...

Page 22: ...Thermific Gas Fired Boiler Wiring Diagrams Page 20 6 1D ON OFF SERIES 1500 1700 2000 Logic Diagram...

Page 23: ...Thermific Gas Fired Boiler Wiring Diagrams Page 21 6 1E ON OFF IRI SERIES 1500 1700 2000 Wiring Diagram...

Page 24: ...Thermific Gas Fired Boiler Wiring Diagrams Page 22 6 1E ON OFF IRI SERIES 1500 1700 2000 Logic Diagram...

Page 25: ...Thermific Gas Fired Boiler Wiring Diagrams Page 23 6 2 AUXILIARY CONTROL PANEL 6 2 1 On Off Auxiliary Control Panel...

Page 26: ...Page 24...

Reviews: