PF6000X
Installation Check List
Barrier Maintenance
System Operation - The user FULLY understands
YES
NO
How to operate the system with all control devices
How to isolate the power to the automation system
How to manually release the system in event of power failure
The safety rules and issues associated with your system
Safety devices on the system have been verified and checked
Safety devices and features suit the site/application for which it was designed
How to open the door on the equipment
Check the following items
YES
NO
Door keys have been handed over
Key switch keys have been handed over
All equipment and site has been left in a clean and safe state
Any warning signage has been fitted by Engineer/Client to make people aware
Any times and special programming instructions undertaken
Product works the way site need it to this includes “no passage time out” etc
System has had the completed conformity certificate
All items on the delivery note have been handed over to client/site -
this should be signed for on the separate sheet which is titled “Delivery Note” (green/ or yellow paper) if parts missing call supplier
The engineer has expressed the importance of regularly maintaining the equipment
POWER ISOLATION - The power isolator for your automation system is located at:
.....................................................................................................................................................
The following denotes that the above has been completed to a satisfactory standard. The engineer has explained the system
of operation to you and any devices that you have had fitted. If this is agreed and has been displayed please sign in the
indicated fields below. All information will be passed on correctly to other system users. The users of the system will use this
system correctly and safely.
Engineers Name: .............................................................. Engineers Signature: ...........................................
Clients Name: ................................................................... Clients Signature: .................................................
Summary of Contents for PF6000X
Page 1: ...PF6000X Automatic Barrier Rev 1 0 Installation Operation Maintenance Manual ...
Page 11: ...PF6000X Handing Change Procedure ...
Page 12: ...PF6000X Handing Change Procedure ...
Page 13: ...PF6000X Handing Change Procedure ...
Page 14: ...PF6000X Barrier Manual Release Procedure ...
Page 15: ...PF6000X Straining Wire Assembly ...
Page 23: ...PF6000X Loop Detector Guide Relay Functionality Diagnostics ...
Page 28: ...PF6000X Safety Edge Setup ...
Page 29: ...PF6000X Safety Edge Setup ...