background image

6

Parker Hannifin Corporation

Tube Fittings Division

Columbus, Ohio

http://www.parker.com/tfd

Parflange ECO 25 

Hydraulic Flanging and Flaring Tool

Tube End Preparation

Tube end preparation is one of the most critical processes in 

obtaining an optimum seal of a flanged or flared tube end con-

nection. Regardless of the tube material, similar guidelines for 

tube cut-off, deburring, and cleanliness can help assure the tube 

to fitting connection remains leak free.

Tube Cutting

•   It is critical that the tube be cut squarely /- 1° in order 

to assure the proper tube to fitting connection. A tube end 

which is not cut squarely may result in a flange or flare which 

is not circular, potentially causing leakage.

•   When cutting tube in preparation for flanging or flaring, a saw 

which utilizes a toothed blade is recommended. This type of 

tool will assure that the tube end is not hardened from exces-

sive heat or cold working of material.

 

  Recommended

  

  Low speed Circular Saw, Hacksaw

 

  Not Recommended

  

  Rotary Tube Cutter, Abrasive Saw

Tube Deburring

•   Deburring the inside and outside diameter of the tube end is 

necessary to assure the tube fits properly inside the flange 

or flare sleeve. In addition, proper deburring of the tube end 

is necessary to form a flanged or flared tube end which is 

free of imperfections that may create a leak path between 

the tube and fitting.

Improper Cut

Proper Cut

Samples of improper and proper cuts on steel tube

Summary of Contents for Parflange ECO 25

Page 1: ...Parflange ECO 25 Hydraulic Flanging and Flaring Tool Operation Manual Bulletin 4391 ECO25 October 2019...

Page 2: ...he product or system in the current product catalog Due to the variety of operating conditions and applications for these products or systems the user through its own analysis and testing is solely re...

Page 3: ...fd Parflange ECO 25 Hydraulic Flanging and Flaring Tool Table of Contents Features and Advantages 4 ECO 25 Specifications 5 Setup Instructions 5 Tube End Preparation 6 90 Flanging Information for Seal...

Page 4: ...for each tube outside diameter Portable The ECO 25 has handles on three sides of the machine making moving it around the workplace an easy task It can either be set on its rubber feet or for a more pe...

Page 5: ...art number 6 G6L S onto the NPT Pipe Thread end of the pressure gauge part number 900044 with a pipe thread sealant Step 4 Pressure Gauge Assemble the Pressure Gauge and Adapter assembly onto the bran...

Page 6: ...arely may result in a flange or flare which is not circular potentially causing leakage When cutting tube in preparation for flanging or flaring a saw which utilizes a toothed blade is recommended Thi...

Page 7: ...0X049180SS 5 8 0 065 B4010X065180 B4010X065180SS 5 8 0 083 B4010X083180 B4010X083180SS 5 8 0 095 B4010X095180 B4010X095180SS 5 8 0 120 B4010X120180 3 4 0 049 B4012X049180 B4012X049180SS 3 4 0 065 B401...

Page 8: ...2600 0072 0208 5000 5 8 0 095 0071 0197 2000 0066 0206 5000 5 8 0 120 0068 0208 4800 3 4 0 049 0081 0197 1500 0077 0202 4600 3 4 0 065 0075 0200 2000 0067 0206 5600 3 4 0 083 0075 0202 3000 0064 0200...

Page 9: ...TFD for more information 90 Flanging Information for Seal Lok Fittings LB 2000 Lubricant ECO 25 Operating Instructions for 90 Flanging for Seal Lok FIttings Step 1 Measure the tube O D and wall thick...

Page 10: ...of the machine using the keyways on either side to secure the die Ensure that the 90 Flange side of the die half is facing toward the main spindle head of the machine away from the operator Step 7 Pl...

Page 11: ...clamp tube in die set Be sure to properly support long tubes during the clamping and flanging process Step 13 Note Look up the recommended flanging pressure for the O D wall thickness and tube materi...

Page 12: ...rgize the hy draulic power supply This will allow the flanging pin and spindle head to retract to their original position Step 17 Press the red stop button on the front of the machine to stop rotation...

Page 13: ...utsidediameter wall thickness and material of the tubing Once the tooling and tubing have been verified the correct method of increasing or decreasing the diameter of the tube flangeistoaltertheHeadSt...

Page 14: ...074 1 2 0 065 B4008X065074 1 2 0 083 B4008X083074 5 8 0 049 B4010X049074 5 8 0 065 B4010X065074 5 8 0 083 B4010X083074 5 8 0 095 B4010X095074 3 4 0 049 B4012X049074 3 4 0 065 B4012X065074 3 4 0 083 B4...

Page 15: ...275 1500 5 8 0 065 0150 0275 1500 0150 0275 2000 5 8 0 083 0150 0275 2000 0150 0275 2000 5 8 0 095 0150 0275 2000 0150 0275 2500 3 4 0 049 0150 0275 1000 0150 0275 1500 3 4 0 065 0150 0275 1500 0150 0...

Page 16: ...cant 37 Flaring Information for Triple Lok Fittings LB 2000 Lubricant ECO 25 Operating Instructions for 37 Flaring for Triple Lok FIttings Step 1 Measure the tube O D and wall thickness for proper die...

Page 17: ...machine away from the operator Step 7 Insert the top half of the die set into the die cavity on top of the other half also ensuring that the 37 Flare side of the die half is facing toward the main sp...

Page 18: ...Be sure to properly support long tubes during the clamping and flaring process Step 13 Note Look up the recommended flaring pressure for the O D wall thickness and tube material you are using from the...

Page 19: ...gizethehydraulic power supply This will allow the flaring pin and spindle head to retract to their original position Step 17 Press the red stop button on the front of the machine to stop rotation of t...

Page 20: ...die set are being used for the outside diameter wall thickness and material tubing you are using Keep in mind that each Die Set can be used with every wall thickness of that size tubing and also with...

Page 21: ...S OR ENVIRONMENTS EXCEPT AS EXPRESSLY STATED HEREIN ALL PRODUCTS ARE PROVIDED AS IS 6 Claims Commencement of Actions Buyer shall promptly inspect all Products upon receipt No claims for shortages will...

Page 22: ...ying Seller within ten 10 days after Buyer becomes aware of any such claim and Seller having sole control over the defense of the claim including all negotiations for settlement or compromise If one o...

Page 23: ...23 Parker Hannifin Corporation Tube Fittings Division Columbus Ohio http www parker com tfd Parflange ECO 25 Hydraulic Flanging and Flaring Tool Notes...

Page 24: ...cturing locations and sales offices throughout North America South America Europe and Asia Pacific For information call toll free 1 800 C PARKER 1 800 272 7537 Parker Fluid Connectors Group North Amer...

Reviews: