- 8 -
ELectrical Connection
Service Switch (On Models SMART CYCLE PLUS 300 to 3,000)
1. Remove side cover and locate electrical box.
2. Remove
electric
box
cover from inside unit.
3. Locate the wires.
4. Locate hole on side of box, place and tighten connector, run wires through connector.
5. Using wire connectors, connect Black to Hot wire, White to Neutral and Green to Ground wire.
Refer to table above for voltage and wire colors.
6. Make sure no bare wire is exposed; replace box cover and screw closed.
7. Turn Service Switch “ON”.
8. Replace side covers.
Electrical Hook-up
Voltage Phase
Wire
Colors
115V
Single
Black, White, Green
230V Single Black,
Red,
Green
230V
3 Phase
3 Black, 1 Green
460V
3 Phase
3 Black, 1 Green
575V
3 Phase
3 Black, 1 Green
To be performed by a qualified person only.
Risk of serious injury or death. Before
connecting electrical power to the dryer check
for correct voltage and phase at the connection
box. All units
must be
externally grounded to
protect against sever electrical shock.
Toggle Switch shown in the “OFF” position as
shipped. Switch must remain in the “OFF”
position until ALL electrical wiring has been
completed.
Summary of Contents for Airtek SMART CYCLE PLUS 100
Page 6: ...6 Fig 2 Models 80 300...
Page 26: ...26 Section 8 0 MAINTENANCE CHARTS cont Element Replacement Log Part No Date Initials...
Page 27: ...27 Section 9 0 ASSOCIATED DRAWINGS...
Page 28: ...28...
Page 29: ...29...
Page 30: ...30...
Page 31: ...31...
Page 32: ...32...
Page 33: ...33...
Page 34: ...34...
Page 35: ...35...
Page 36: ...36...
Page 37: ...37...
Page 38: ...38...
Page 39: ...39...
Page 40: ...40...
Page 41: ...41...
Page 42: ...42...
Page 43: ...43...
Page 44: ...44...