EN
| User Manual
Installation
18
BSP-MT 10-95/D3
Installation
Only authorized and qualifi ed specialist personnel may carry out work on pipes
and electrical systems.
As soon as the dryer has been set up at its installation location, you can install the com-
pressed air infeed and outlet lines make the electrical connections.
Preconditions for installation
For a correct installation the following preconditions must be met on the part of the owner.
◊
Connections and lines for the infeed and outfeed of compressed air must be provided.
◊
A compressed air inlet valve as well as a compressed air outlet valve must be installed by
the owner, so that the dryer can be installed and maintained in a depressurised condition
(see also the installation example on page 19).
◊
All pipes, couplings, and connections must have the correct diameter and match the oper-
ating pressure.
Hazard caused by exceeding the limit values!
A safety device must be provided in order to protect against the maximum
permissible operating pressure from being exceeded.
The safety device must be installed so that the dryer is reliably protected from
exceeding the maximum permitted operating pressure even when the tempera-
ture of the compressed gas increases.
The data required to meet these preconditions are contained in the technical documentation
attached in the annex.
Warning!
If the above preconditions are not complied with, a safe operation of the dryer
cannot be assured. Also, the functionality of the dryer may be detrimentally
affected.
Summary of Contents for BSP-MT 10/D3
Page 2: ......
Page 56: ...EN User Manual 54 BSP MT 10 95 D3 ...
Page 57: ...EN User Manual BSP MT 10 95 D3 55 ...
Page 58: ...EN User Manual 56 BSP MT 10 95 D3 ...
Page 59: ......