Warning!
The dryer must be taken into operation by trained personnel only! Untrained
personnel does not have the required knowledge. Such personnel might cause
serious faults.
Note:
You can order the initial commissioning and start-up from the manufacturer
and have your personnel trained by the manufacturer. For telephone number,
see page 4.
◊
Carry out all prescribed tests and checks.
◊
Before start-up, ensure that no tools or other foreign parts have been left lying in a part of
the dryer where they might pose a hazard to the dryer being started up.
Requirements for initial start-up
For the fi rst start-up the following preconditions must have been met:
◊
The pipe system is free from contaminations.
◊
All shutdown valves are closed.
◊
The dryer is correctly sited and installed.
Checks before start-up
Ensure that
◊
all pipe, cable and bolt connections on the dryer have been retightened,
◊
no pipes chafe against body edges,
◊
all mountings are perfectly secure,
◊
the needle valve of the oil indicator is closed,
◊
the electrical connections are in safe contact and in good condition,
◊
owner-end and pressurised parts such as safety valves or other devices are not blocked up
by dirt or paint,
◊
all compressed air system parts which are pressurised (valves, hoses etc.) are free from
wear symptoms and defects.
Summary of Contents for BSP-MT 10/D3
Page 2: ......
Page 56: ...EN User Manual 54 BSP MT 10 95 D3 ...
Page 57: ...EN User Manual BSP MT 10 95 D3 55 ...
Page 58: ...EN User Manual 56 BSP MT 10 95 D3 ...
Page 59: ......