26
HGF Series Service Procedure
Figure 66
Figure 65
Figure 64
Figure 63
16. Place commutator ring (21) either
side up on top of stator (25). Align
commutator ring screw recesses
with stator screw slots. See
FIGURE 63.
Install commutator ring
17. Place commutator cover (20) on
top of commutator ring (21) with
flat surface toward commutator.
Align screw holes in cover, with
screw holes in drive plate (26).
See FIGURE 64.
Install commutator
cover
18. Screw the eleven hex. socket
head cap screws (18) loosely into
metering package. See FIGURE 65.
Install cap screws
NOTE: The commutator ring (21)
must be concentric with drive plate
(26) within .005 inch (.127 mm) total
indicator reading after tightening the
eleven hex. socket head cap screws
(18). The next two procedures are a
method of achieving the concentricity.
NOTE
19. Place the metering ring (17) on a
hard flat surface. Place the
assembled metering package into
the metering ring with the
commutator cover (20) down, such
that the drive plate is partially out
of the metering ring. (A suitable
wood block under the metering
package will hold it in this
position.) See FIGURE 66.
Align commutator ring
concentrically with
drive plate