Installing the Carrier and Assembly Components
3-7
3000-A2-GA31-D0
July 1999
Installing the SDCP Ribbon Cable
NOTE
The SDCP ribbon cable must be
connected to the carrier
backplane before the power
transformer unit and optional fan
module are installed.
Removing power causes loss of
service to all circuit card slots in
the carrier. It is recommended
that you do not perform this
procedure during peak operating
hours.
"
Procedure
1. Select the carrier on which to install the SDCP.
The SDCP can be installed on any carrier in a
cabinet. The most convenient height for the SDCP
is at eye level (the second or third carrier from the
top of the cabinet).
496-14892
P
a
r
a
dyn
e
SDCP
Installed at
Eye Level
2. Remove the carrier’s cover plate by unscrewing
the four captive screws.
If the ac power
transformer unit is . . .
Then go
to . . .
Installed
Step 3
Not installed
Step 6
3. At the rear of the carrier, disconnect the ac power
cord from the carrier. Unscrew the two captive
screws securing the power transformer unit.
P26
P25
P24
P23
P20 P19
J2
P22
J1
P21
P20 P19
496-14804-01
AC
Receptacle
4. Disconnect the two power connectors (P19 and
P20) by pressing the catch on the bottom of each
and pull it free of its mating connector.
5. At the front of the carrier, slide the power
transformer unit straight out and set aside. You
may need another person standing at the rear to
feed the transformer output wires through the
opening in the backplane.
Summary of Contents for Compshere 3000 Series
Page 1: ...COMSPHERE 3000 SERIES CARRIER INSTALLATION MANUAL Document No 3000 A2 GA31 D0 July 1999 ...
Page 10: ...COMSPHERE 3000 Series Carrier iv July 1999 3000 A2 GA31 D0 This page intentionally left blank ...
Page 12: ...COMSPHERE 3000 Series Carrier vi July 1999 3000 A2 GA31 D0 ...
Page 52: ...COMSPHERE 3000 Series Carrier 5 8 July 1999 3000 A2 GA31 D0 ...